ZHOU Hailiang, TENG Minhua Zhejiang Energy Technology Co.. Water blocking caused tube burst in final superheater of a boiler:reason analysis and prevention[J]. Thermal power generation, 2013, 42(5): 99-101.
ZHOU Hailiang, TENG Minhua Zhejiang Energy Technology Co.. Water blocking caused tube burst in final superheater of a boiler:reason analysis and prevention[J]. Thermal power generation, 2013, 42(5): 99-101.DOI:
Several tube burst failures occurred on the similar position of a 300 MW unit boiler's final superheater.The burst tube panel is close to the bottom of the final superheater inlet header
right against the steam source of the second stage desuperheater.Such factors as broken of the water spray pipe for second stage desuperheater
improper operation of the second stage desuperheating water during the boiler's start and running were considered as the main reasons that easily resulted in accumulation of desuperheating water which was not well atomized in angle heads of the heating tubes
leading to water blocking caused tube burst.Thus
to prevent the water blocking in heating surface
several countermeasures were put forward
like ensuring the furnace is heated evenly during the boiler start
controling the desuperheating water flow in initial stage strictly
using the second stage desuperheating water as less as possible