KUANG Wei, YANG Guanglan, GOU Jianbing, et al. Key parameters control during cold state start-up of a 300MW unit with no start-up steam[J]. Thermal power generation, 2014, 43(8): 151-152.
KUANG Wei, YANG Guanglan, GOU Jianbing, et al. Key parameters control during cold state start-up of a 300MW unit with no start-up steam[J]. Thermal power generation, 2014, 43(8): 151-152.DOI:
The dangerous points of cold state start-up of a 300 MW unit without start-up steam were introduced.Through control of the key parameters(such as the drum wall temperature difference
drainage flow at the boiler side
steam temperature and pressure and reburning of the flue gas in tail duct)during the unit start-up
the problems easily occurred during the unit start-up with no start-up steam can be avoided