300MW机组CFB锅炉滚筒冷渣器存在问题及处理
摘要
某电厂2×300 MW机组循环流化床(CFB)锅炉滚筒冷渣器在运行中存在出力不足、排渣温度高等问题
提出了拆除滚筒冷渣器内层水冷套
将双筒改为单筒结构
并在内壁按轴向均匀增加8组水冷管排等改造措施。实施后
基本解决了滚筒冷渣器进渣端板散热差以及夹层进渣口堵塞、排渣温度高等问题
提高了冷渣器的换热效率
保证了滚筒冷渣器长时间的连续稳定运行。
Abstract
Insufficient output
over high discharged slag temperature and other problems occurred during operation of the roller slag cooler in a 300 MW unit CFB boiler. Thus
several countermeasures were put forward
such as removing the inner water cooling jacket of the roller slag cooler
changing the double-roller into the single-roller
and adding eight groups of water cooling tube rows in axial direction of the inner wall. After the above measures were taken
problems like the poor heat dissipation and block at inlet of the roller slag cooler
as well as the over high discharged slag temperature were basically solved. Therefore
the heat transfer efficiency of the slag cooler was enhanced and long-term stable operation of the roller slag cooler was ensured.