Through practical measurement on a natural draft cooling tower in a 150 MW unit
the efficiency and coefficient of heat and mass transfer in the tower were obtained
and several problems during the tower operation and its performance optimization direction were found.On this basis
the temperature and pressure distribution in rain area and filling area of the cooling tower were numerically simulated.The results show that
with the filling material thickness of 3.0minside the cooling tower
42.1% temperature drop needs 55.8% pressure loss
and the optimum thickness of the padding is around 2.5m.The optimum operation strategy of this circulating cooling water pump is one pump with two towers
and the wet bulb efficiency of the cooling tower can reach 75.0%
the net power generation can increase by 3.007 MW compared with the unit using two pumps with one tower strategy.