ZHANG Ruixiang, WANG Bangxing, ZHAO Feng, et al. Cleaning schemes for the secondary circuit in high temperature gas-cooled reactors[J]. Thermal power generation, 2017, 46(6): 130-135.
ZHANG Ruixiang, WANG Bangxing, ZHAO Feng, et al. Cleaning schemes for the secondary circuit in high temperature gas-cooled reactors[J]. Thermal power generation, 2017, 46(6): 130-135.DOI:
Cleaning the secondary circuit in nuclear power plants is an important process before the unit starting. Cleaning technologies for the secondary circuit of a pressurized water reactor(PWR) are relatively mature
but the ones for the secondary circuit in the high temperature gas-cooled reactor(HTGR) are lack of standards and processes. Thus
according to the system features and equipment materials of the secondary circuit in the HTGR
feasibility research on the cleaning process was conducted from the aspects of theory and engineering experience
by referring the cleaning processes for thermal power plant systems and PWR secondary circuits. Finally
a combined cleaning process was determined
which comprises cleaning installation
chemical cleaning and the secondary circuit overall water flushing. By comparing the feasibility of the three processes of manual cleaning
steam purging and chemical cleaning. Through comparing the feasibility of manual cleaning
steam blowing and chemical cleaning
it proved that the main steam pipe and high pressure side pipe cleaning process can only be realized by chemical cleaning process. After cleaning
the system should be washed with a large flow of water flushing using demineralized water(pH 9~10).