Analysis of Nuclear Power Plant Participating in Peak Load Regulation of Power Grid and Combined Operation With Pumped Storage Power Plant
-
摘要: 研究了核电机组(nuclear power plant,NPP)参与电网调峰的必要性、可行性,根据核电特点,利用核电机组模型仿真分析了核电机组调峰运行的特性及相互影响因素,提出了核电机组直接参与电网日负荷调峰的运行模式。结合抽水蓄能的运行特性,比较分析了核电与抽水蓄能机组联合的3种调峰运行模式。结果表明,核电机组具有良好的调峰能力,可按照"12—3—6—3"的出力方式参与电网日负荷调峰,但其调峰的深度和速度受到安全性及经济性的限制。将抽水蓄能机组与核电机组联合运行,可满足电网调峰的要求,并保证核电机组带基荷。Abstract: The necessity and feasibility of nuclear power plant(NPP) participating in peak load regulation of power system were studied.By establishing NPP model,the performance characteristics of NPP and effect factors were simulated and analyzed.Then the operation mode of NPP directly participating in daily peak load regulation was proposed.Based on the operation characteristics of pumped storage power station,three combined modes of NPP and pumped storage power station were analyzed and compared.The results show that NPP has excellent capability for peak load regulation,which can meet the daily load following with "12-—3-—6-—3" mode of power regulation,but the depth and speed of power regulation are restricted by security and economy.The combined operation of NPP and pumped storage power station can meet the requirements of peak load following,and ensure base-load operation of NPP.
-
[1] 中国国家发展与改革委员会.核电中长期发展规划(2005-2020年)[R].北京:中国国家发展与改革委员会,2007.Development and Innovation Committee of China.Medium-to-longterm development programming of nuclear power(2005—2020)[R].Beijing:Development and Innovation Committee of China,2007(in Chinese). [2] Trehan N K,Saran R.Nuclear power revival[C]//Nuclear ScienceSymposium Conference.Portland,USA:IEEE,2004:3630-3633.
[3] 高志华,任震,黄雯莹.电力市场中调峰权及其交易机制[J].中国电机工程学报,2005,25(5):88-92.Gao Zhihua,Ren Zhen,Huang Wenying.Peak regulation right and thecorresponding transaction mechanism in electricity market[J].Proceedings of the CSEE,2005,25(5):88-92(in Chinese). [4] Levent A H,Altin V.Rule-based fuzzy logic controller for apwr-type nuclear power plant[J].IEEE Transactions on NuclearScience,1991,38(2):883-890.
[5] Berkovich V M,Gorokhov V F,Tatarnikov V P.Possibility ofregulating the capacity of a power system by means of nuclear powerplants[J].Teploenergetika,1974(6):16-19.
[6] Grum A.Design of nuclear power plant with pressurized water reactorfor optimum load follow capbility[J].Atomkernenergic Kerntechnik,1986,48(3):138-143.
[7] Christenson J M.Application of optimal control theory to a loadfollowing pressurized water reactor[J].Nuclear Technology,1992,100(3):361.
[8] 邬国伟,陶谨.压水堆核电站负荷跟踪的研究[J].核动力工程,1998,19(5):394-397.Wu Guowei,Tao Jin.Research of load follow for nuclear power plantwith pressurized water reactors[J].Nuclear Power Engineering,1998,19(5):394-397(in Chinese). [9] 葛斌,吴毅.压水堆机组二回路热力系统实时仿真研究[J].中国电机工程学报,2002,22(6):142-145.Ge Bin,Wu Yi.A study on a real-time simulation for the second loopof pwr nuclear power unit[J].Proceedings of the CSEE,2002,22(6):142-145(in Chinese). [10] 马习朋.大型压水堆核电机组参与电网中间负荷调峰的探讨[J].山东电力技术,2007(6):35-40.Ma Xipeng.Discussion on large-scale PWR power plantsparticipating in sufficing peak-load of grid[J].Shandong ElectricPower Technology,2007(6):35-40(in Chinese). [11] 林诚格,郁祖盛,欧阳予.非能动安全先进核电厂AP1000[M].北京:原子能出版社,2008:28-218.Lin Chengge,Yu Zusheng,Ou Yangyu.An advanced passive plantAP1000[M].Beijing:Atomic Energy Publishing Company,2008:28-218(in Chinese). [12] Brendan K,John K,Harvey L,et al.Nuclear Generating Stations andTransmission Grid Reliability[C]//2007 39th North American PowerSymposium.Las Cruces,USA:Power Engineering Society,2007:279-287.
[13] Maldonado G I.The performance of North American nuclear powerplants during the electric power blackout of August 14,2003[C]//Nuclear Science Symposium Conference.Rome,Italy:IEEE,2004:4603-4606.
[14] 赵洁,刘涤尘,吴耀文.压水堆核电厂接入电力系统建模[J].中国电机工程学报,2007,29(31):8-13.Zhao Jie,Liu Dichen,Wu Yaowen.Modelling of pressurized waterreactor nuclear power plant integrated into power systemsimulation[J].Proceedings of the CSEE,2007,29(31):8-13(inChinese). [15] 张学成,胡学浩,周修铭,等.具有核电模型的中期动态模拟程序开发及大型核电厂与电力系统相互影响的研究[J].电网技术,1995,19(2):5-10.Zhang Xuecheng,Hu Xuehao,Zhou Xiuming,et al.Developmentof midterm dynamic simulation program including nuclear powerplant model and study of interaction between large nuclear powerplant and power system[J].Power System Technology,1995,19(2):5-10(in Chinese). [16] 陈济东.大亚湾核电站系统及运行[M].北京:原子能出版社,1994:25-29.Chen Jidong.The system and operation of Daya Bay Nuclear PowerStation[M].Beijing:Atomic Energy Publishing Company,1994:25-29(in Chinese). [17] 朱继洲.压水堆核电厂的运行[M].北京:原子能出版社,2002:133-136.Zhu Jizhou.The operation of pressurized water reactor nuclear powerplant[M].Beijing:Atomic Energy Publishing Company,2002:133-136(in Chinese). [18] 何永秀,杨薇薇,卢玉,等.周调节抽水蓄能电站在京津唐电网中的调峰与事故响应作用[J].电网技术,2006,30(19):71-75.He Yongxiu,Yang Weiwei,Lu Yu,et al.Peak-load regulation andemergency response function of weekly adjusted pumped storagestation in Beijing-Tianjin-Tangshan Power Grid[J].Power SystemTechnology,2006,30(19):71-75(in Chinese). [19] 杨京燕,付志奎.抽水蓄能电厂规划评估模型和算法[J].中国电机工程学报,2001,21(2):33-36.Yang Jingyan,Fu Zhikui.A model and arithmetic for the planning ofpumped-storage power plant[J].Proceedings of the CSEE,2001,21(2):33-36(in Chinese). [20] 中国电力科学研究院.电力系统分析综合程序(PSASP)用户手册[R].北京:中国电力科学研究院,2001.Electric Power Research Institute of China.User manual of powersystem analysis software package[R].Beijing:Electric PowerResearch Institute of China,2001(in Chinese).
计量
- 文章访问数: 0
- HTML全文浏览量: 0
- PDF下载量: 0