李涛, 赵荥, 贾楠, 翟汉波, 张浦阳. 复合筒型基础沉贯调平过程中土体渗流特性研究[J]. 太阳能学报, 2021, 42(12): 253-260. DOI: 10.19912/j.0254-0096.tynxb.2020-0477
引用本文: 李涛, 赵荥, 贾楠, 翟汉波, 张浦阳. 复合筒型基础沉贯调平过程中土体渗流特性研究[J]. 太阳能学报, 2021, 42(12): 253-260. DOI: 10.19912/j.0254-0096.tynxb.2020-0477
Li Tao, Zhao Xing, Jia Nan, Zhai Hanbo, Zhang Puyang. RESEARCH ON SOIL SEEPAGE CHARACTERISTICS IN SUCTION PENETRATION LEVELING PROCESS OF COMPOSITE BUCKET FOUNDATION[J]. Acta Energiae Solaris Sinica, 2021, 42(12): 253-260. DOI: 10.19912/j.0254-0096.tynxb.2020-0477
Citation: Li Tao, Zhao Xing, Jia Nan, Zhai Hanbo, Zhang Puyang. RESEARCH ON SOIL SEEPAGE CHARACTERISTICS IN SUCTION PENETRATION LEVELING PROCESS OF COMPOSITE BUCKET FOUNDATION[J]. Acta Energiae Solaris Sinica, 2021, 42(12): 253-260. DOI: 10.19912/j.0254-0096.tynxb.2020-0477

复合筒型基础沉贯调平过程中土体渗流特性研究

RESEARCH ON SOIL SEEPAGE CHARACTERISTICS IN SUCTION PENETRATION LEVELING PROCESS OF COMPOSITE BUCKET FOUNDATION

  • 摘要: 为了明确筒型基础在安装过程中基础周围的渗流场及孔隙水压力变化,采用ADINA有限元软件对单筒多舱基础(复合筒型基础)在不同土质条件及沉贯深度的沉贯过程及调平过程渗流场进行数值分析。研究筒型基础吸力作用下筒内土体完整的渗流场,并对单筒多舱型筒型基础倾斜工况下的渗流场进行分析,揭示调平状态地基土体渗透破坏的机理,以期为实际工程复合筒型基础下沉和调平施工方案提供参考。

     

    Abstract: The seepage action during the installation of the bucket foundation will affect the penetration resistance of the foundation in the suction penetration process,resulting in inaccurate suction application,and then affect the success or failure of its construction. In order to clarify the seepage field and pore water pressure changes around the foundation during the installation of the bucket foundation,the ADINA finite element software was used to analyze the seepage field in suction penetration leveling process of the single bucket foundation with bulkheads(composite bucket foundation)under different soil conditions and penetration depths. The seepage field of the soil in the bucket under the suction of the CBF is studied,and the seepage field under the inclined condition of the CBF is also analyzed. The seepage failure mechanism of levelled foundation soil is revealed,which provide a reference for the sinking and leveling construction of the CBF in the actual project.

     

/