Abstract:
This paper first uses the static method to analyze the PV power generation potential in the Ordos region based on the land area and PV power generation situation. Then,combined with the thermal power generation,coal consumption,and PV power generation in Ordos region,the energy consumption data of Ordos region is analyzed. Finally,based on China’s carbon neutrality target,the electricity target,coal target,and investment target for PV power generation projects under the carbon neutrality target in the Ordos region are calculated year-on-year. The analysis results show that:1) With a land area of 37000 km2 available for PV power generation in the Ordos region,a PV power generation capacity of 1.48×109 kW can be achieved,resulting in a PV power generation capacity of 1.92×1013 kWh;2) When the total electricity demand of 3.90×1011 kWh in the Ordos region by 2060 is met by PV power generation,the land area required for the construction of PV power stations is 7500 km2,which is only 20% of the available land area for PV power generation. Therefore,the goal of achieving carbon neutral electricity in Ordos region can be achieved through PV power generation;3) To achieve the goal of carbon neutrality,the total investment in PV power stations and energy storage systems in the Ordos region will account for 21% of GDP. This goal can only be achieved by strengthening financial and policy guidance.