Abstract:
In Inner Mongolia Huadian Energy Co., Ltd.Baotou Generation Branch, some issues existed in 600 MW steam turbine power system, such as low quality of water level adjustment, poor economical efficiency, and so on.By water level improving test, reconstruction water level measurement tubes and protecting the way of controlling logic optimization so as to make high pressure system better.After optimization, HPS can run in the base level, and all protect switches operate normally, water level adjustment quality meets the requrements, and the stability and economy of HPS is improved.