By improving the constraint conditions of the traditional mixed-linear integer programming model and introducing optional path pre-reduction and dynamically generated non-crossing constraints of cables
a path planning method for the collector system suitable for large-scale offshore wind farms is proposed. The case test shows that the cost of the optimized wind farm collection line is reduced by 7.27%. The improved model significantly reduces the storage space requirement and solution time
and greatly enhances the computational efficiency.
TAYLOR P, YUE H, CAMPOS-GAONA D, et al.Wind farm array cable layout optimisation for complex offshore sites: a decomposition based heuristic approach[J]. IET renewable power generation, 2023, 17(2): 243-259.
BAUER J, LYSGAARD J.The offshore wind farm array cable layout problem: a planar open vehicle routing problem[J]. Journal of the Operational Research Society, 2015, 66(3): 360-368.
PÉREZ-RÚA J A, STOLPE M, DAS K, et al. Global optimization of offshore wind farm collection systems[J]. IEEE transactions on power systems, 2020, 35(3): 2256-2267.
FISCHETTI M.On the optimized design of next-generation wind farms[J]. European journal of operational research, 2021, 291(3): 862-870.
FISCHETTI M, PISINGER D.Optimizing wind farm cable routing considering power losses[J]. European journal of operational research, 2018, 270(3): 917-930.
ŽARKOVIĆ S D, SHAYESTEH E, HILBER P.Onshore wind farm-Reliability centered cable routing[J]. Electric power systems research, 2021, 196: 107201.
KRISTOFFERSEN J R, CHRISTIANSEN P.Horns rev offshore windfarm: its main controller and remote control system[J]. Wind engineering, 2003, 27(5): 351-359.