Post-disaster restoration scheduling of distribution networks coordinating fault repair and topology reconfiguration
Power System Intelligent Control and Data Analysis|更新时间:2026-03-09
|
Post-disaster restoration scheduling of distribution networks coordinating fault repair and topology reconfiguration
“Experts have established a post disaster recovery model for the distribution network, which utilizes coordinated optimization of repair path planning and topology reconstruction to reduce system load shedding and provide a solution to enhance the elastic recovery capability of the distribution network.”
BLASTINGVol. 48, Issue 2, Pages: 96-105(2026)
作者机构:
1.国网江苏省电力有限公司 盐城供电分公司,江苏 盐城 224000
2.国网江苏省电力有限公司;阜宁县供电分公司,江苏 盐城 224400
作者简介:
基金信息:
Science and Technology Project of State Grid Jiangsu Electric Power Company Limted(B310A02580PN)
Stability control of multiband power system stabilizer based on Transformer-embedded deep deterministic policy gradient method
Economic operation of a multi-energy system based on adaptive learning rate firefly algorithm
Day-ahead electricity price prediction model based on GRU optimized by crossover optimization algorithm
Related Author
LI Xiaozhu
CHU Longhao
WANG Rui
ZHANG Weizhi
TIAN Runduo
WANG Weisheng
ZHANG Zhiyuan
ZHAI Shuo
Related Institution
新疆大学 可再生能源发电与并网技术教育部工程研究中心,乌鲁木齐 830047) (Engineering Research Center of Education Ministry for Renewable Energy Power Generation and Grid Connection, Xinjiang University, Urumqi 830047, China
东北大学 信息科学与工程学院,沈阳 110167) (College of Information Science and Engineering, Northeastern University, Shenyang 110167, China
School of Electrical Engineering,Guangxi University
College of Transportation and Communication, Nanchang Jiaotong Institute
Henan International Joint Laboratory of Behavior Optimization Control for Smart Robots(Huanghuai University)