您当前的位置:
首页 >
文章列表页 >
Multiple short⁃term load forecasting in integrated energy system based on RBF⁃NN model
更新时间:2026-03-05
    • Multiple short⁃term load forecasting in integrated energy system based on RBF⁃NN model

    • Vol. 21, Issue 4, (2019)
    • DOI:10.3969/j.issn.1009-1831.2019.04.007    

      CLC:
    • Published:2019

    移动端阅览

  • 翟晶晶, 吴晓蓓, 王力立. Multiple short⁃term load forecasting in integrated energy system based on RBF⁃NN model[J]. 2019, 21(4). DOI: 10.3969/j.issn.1009-1831.2019.04.007.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Design and implementation of virtual power plant system supporting dynamic aggregation of equipment
Optimal scheduling of integrated energy system considering heat-electricity-gashydrogen-carbon coupling and the source-load response
Integrated energy system load forecasting based on SEResNet-BiLSTM network
Short-term power load forecasting based on load decomposition and identification
Low-carbon economy optimization scheduling of integrated energy system considering the uncertainty of differentiated demand response

Related Author

徐哲男
刘泽三
诸葛雪迎
孟洪民
黄 澍
王孟强
吕 东
冒烨颖

Related Institution

国网信息通信产业集团有限公司
国网江苏省电力有限公司 苏州供电分公司
国网河北省电力有限公司 信息通信分公司
电工装备可靠性与智能化国家重点实验室(河北工业大学)
河北工业大学 人工智能与数据科学学院
0