Under the influence of low-level load during the Spring Festival
the thermo electric generating set of Jiangsu grid fails to open enough thermal generators
leading to the difficulty in regulating peak and valley load. The valley load period during the Spring Festival is just the period when renewable energy
such as wind and photovoltaic
reaches its peak in generating power
renewable energy generation is forced to participate in regulating the load at a low capacity
adding a negative effect on the full utilization of renewable energy. To deal with the above problems
State Grid Jiangsu Electric Power Company organized the first provincial “valley shaft”demand response during the Spring Festival (Feb.16th-18th)
providing the load of 1.68 million kilowatts at one time and 9.28 million kilowatts in total. This action efficiently alleviates the pressure on regulating the power load
assuring the full utilization of the renewable energy generation in this region.