GA-PSO Hybrid Optimization Method for Substation Site Selection Under Constraint of Flood Storage and Detention Areas
更新时间:2025-12-08
    • GA-PSO Hybrid Optimization Method for Substation Site Selection Under Constraint of Flood Storage and Detention Areas

    • Vol. 45, Issue 4, Pages: 32-38(2025)
    • DOI:10.3969/j.issn.1008-0198.2025.04.006    

      CLC: TM63
    • Published Online:05 September 2025,

      Published:05 September 2025

    移动端阅览

  • LEI Chuanli, LUO Huiping, TANG Waiwen, et al. GA-PSO Hybrid Optimization Method for Substation Site Selection Under Constraint of Flood Storage and Detention Areas[J]. 2025, 45(4): 32-38. DOI: 10.3969/j.issn.1008-0198.2025.04.006.

  •  
  •  

0

Views

13

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A Three-Dimensional Modeling Method of Substation Surface Temperature Distribution Based on Decoupling of Thermal and Geometric Information
Summary of Reliability Research on High Voltage Electrical Device in Substation
Research on Comparison Method of Substation Design Scheme Based on Life Cycle Cost

Related Author

TANG Jiangqi
ZHONG Yuming
DENG Wei
DING Yuzhu
KANG Wen
WU Shuaibing
XIE Yin′e
TANG Qi

Related Institution

State Grid Hunan Extra High Voltage Substation Company
State Grid Loudi Power Supply Company
Senseed (Suzhou) Technology Co., Ltd.
State Grid Hunan Electric Power Company Limited Research Institute
Education and Training Center,Loudi Electric Power Supply Bureau
0