您当前的位置:
首页 >
文章列表页 >
Monthly Runoff Time Series Prediction Based on STL-WPT-RFO-HLSTSVR Model
更新时间:2026-03-04
    • Monthly Runoff Time Series Prediction Based on STL-WPT-RFO-HLSTSVR Model

    • PEARL RIVER   Vol. 47, Issue 2, Pages: 56-67(2026)
    • DOI:10.3969/j.issn.1001-9235.2026.02.006    

      CLC: TV121+.4
    • Received:12 June 2025,

      Revised:2025-08-17,

      Accepted:30 August 2025,

      Online First:22 September 2025,

      Published:25 February 2026

    移动端阅览

  • GUO Tingting,CUI Dongwen.Monthly Runoff Time Series Prediction Based on STL-WPT-RFO-HLSTSVR Model[J].PEARL RIVER,2026,47(02):56-67. DOI: 10.3969/j.issn.1001-9235.2026.02.006.

  •  
  •  

0

Views

240

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

KAN Groundwater Level Prediction Model Based on WPT Secondary Decomposition and CPO
Research on CFO-LSTELM Daily Water Supply Time Series Prediction Based on Wavelet Packet Decomposition
Improved Monthly Runoff Prediction of OSELM Based on Secondary Decomposition Technique and Optimization of Ten "Bird" Swarm Algorithms
Analysis of the Evolution Characteristics of Meteorological Drought Events in Wenzhou City Based on Three-dimensional Recognition
Construction and Application of Supervision Level Evaluation System for Central Bars on Main Stream of Dongjiang River in Guangdong Province

Related Author

CUI Dongwen
GUO Tingting
RAO Qingyang
YANG Qiongbo
CUI Dongwen
CUI Dongwen
CUI Dongwen
YANG Qiongbo

Related Institution

Wenshan Water Bureau, Wenshan Prefecture, Wenshan
Honghe Branch of Yunnan Provincial Hydrological and Water Resources Bureau, Honghe
Yunnan Honghe Prefecture Water Resources and Hydropower Survey and Design Institute, Honghe
Huimin Water Supply Co., Ltd., Luxi County, Honghe Prefecture, Honghe
Wenshan Water Bureau, Wenshan
0