Hydrological Simulation and Error Correction in Source Area of Yellow River Based on VIC-BJP Model
|更新时间:2026-02-26
|
Hydrological Simulation and Error Correction in Source Area of Yellow River Based on VIC-BJP Model
“New progress has been made in hydrological simulation research in the Yellow River source area. Experts have used the VIC model to simulate the runoff process at Tangnaihai Station and coupled it with the BJP model for error correction, improving simulation accuracy and quantitatively analyzing uncertainty, providing strong support for ensuring water security and stability in the basin.”
ZHU Changchang,HUANG Huaping.Hydrological Simulation and Error Correction in Source Area of Yellow River Based on VIC-BJP Model[J].PEARL RIVER,2026,47(01):112-119.
ZHU Changchang,HUANG Huaping.Hydrological Simulation and Error Correction in Source Area of Yellow River Based on VIC-BJP Model[J].PEARL RIVER,2026,47(01):112-119. DOI: 10.3969/j.issn.1001-9235.2026.01.012.
Hydrological Simulation and Error Correction in Source Area of Yellow River Based on VIC-BJP Model