您当前的位置:
首页 >
文章列表页 >
某水库输水隧洞洞线调整方案分析与实践
更新时间:2025-12-22
    • 某水库输水隧洞洞线调整方案分析与实践

    • PEARL RIVER   Vol. 46, Issue S2, Pages: 94-96(2025)
    • DOI:10.3969/j.issn.1001-9235.2025.S2.032    

      CLC: TV5
    • Received:11 December 2024,

      Revised:2025-01-08,

      Accepted:14 January 2025,

      Published:31 December 2025

    移动端阅览

  • 何羽祥. 某水库输水隧洞洞线调整方案分析与实践[J]. PEARL RIVER, 2025, 46(S2): 94-96. DOI: 10.3969/j.issn.1001-9235.2025.S2.032.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

干河水库堵漏防渗成库可行性分析
滇中地区岩溶水文地质特征
Construction of Fenggang Tunnel at the Section Cutting through the Dongshen Highway
Application of Sprayed Concrete Supporting Technique to the Tunneling in the Water Accumulated Soft Stratum
Flood Control and Drought Relief Work in Guizhou Province, the Pearl River Upstream

Related Author

陈 杰
曾中磊
靳晓兵
张艳平
SONG Guang-ming
ZHAO Yun
PAN Feng
YANG Feng

Related Institution

(四川省地质矿产勘查开发局四0五地质队,四川 都江堰 )
广东省水利水电第三工程局,广东,东莞,523710%广东省水利水电勘测设计研究院
广东水电二局股份有限公司,广东,增城
贵州省防汛抗旱指挥部办公室
广东省航道局,广东,广州,510115%中山大学地球科学系
0