水电站桥机轨道安装偏差对吊装安全的影响阈值研究
更新时间:2025-12-22
    • 水电站桥机轨道安装偏差对吊装安全的影响阈值研究

    • “In the field of bridge cranes for hydropower stations, experts have constructed a force response model and defined the safety impact threshold of track deviation, providing technical reference for the quality acceptance of bridge crane track installation.”
    • PEARL RIVER   Vol. 46, Issue S2, Pages: 49-51(2025)
    • DOI:10.3969/j.issn.1001-9235.2025.S2.017    

      CLC: TV61
    • Received:26 May 2025,

      Revised:2025-06-18,

      Accepted:25 June 2025,

      Published:31 December 2025

    移动端阅览

  • 王杨. 水电站桥机轨道安装偏差对吊装安全的影响阈值研究[J]. PEARL RIVER, 2025, 46(S2): 49-51. DOI: 10.3969/j.issn.1001-9235.2025.S2.017.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Underground Plant Stack Construction Technology of Pumped Storage Power Station
Lifting Problems and Solutions of Wind Turbine Generator Systems in Highlands,Mountains,and Deserts

Related Author

XU Xiaodong
FANG Kai

Related Institution

No data
0