您当前的位置:
首页 >
文章列表页 >
复杂山地大型风电工程施工关键技术
更新时间:2025-12-22
    • 复杂山地大型风电工程施工关键技术

    • PEARL RIVER   Vol. 46, Issue S2, Pages: 43-45(2025)
    • DOI:10.3969/j.issn.1001-9235.2025.S2.015    

      CLC: TV1
    • Received:17 March 2025,

      Revised:2025-05-12,

      Accepted:12 May 2025,

      Published:31 December 2025

    移动端阅览

  • 张泽华. 复杂山地大型风电工程施工关键技术[J]. PEARL RIVER, 2025, 46(S2): 43-45. DOI: 10.3969/j.issn.1001-9235.2025.S2.015.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of Key Technology of Wind Power Project Construction in Large Mountains in Cold Areas of the Plateau
Large Concrete Placement and Transport
Application of Concrete Cutoff Wall to Cofferdams Upstream and Downstream a Hydropower Station
Research on Video Communication Technology for Engineering Construction under Complex Mountain Conditions
Research on Concrete Construction Technology of Wind Turbine Foundation in Cold Mountains of the Plateau

Related Author

ZHENG Wenkui
LI Tao
GAO Shan
WEN Jianxing
WANG Yong-jian
YANG Fu-qiang
YAO Zhenyong
YANG Enfang

Related Institution

广东水电二局股份有限公司,广东,新塘
武警水电一总队一支队
0