大型火电工程项目建设需经历可行性研究、初步设计、施工图设计、施工调试及运行优化等环节。对电气专业优化的以下几方面进行述说:电气优化的阶段工作、开展设计优化采取的措施
优化设计的主要专题及优化设计的重点、难点。在满足规程、规范的条件下
从可靠性、灵活性、先进性、实用性、经济性比较
希望在设计、选型、施工各环节进行优化
使项目建设降本增效
保证企业利益最大化。
Large-scale thermal power project construc-tion needs to go through several procedures
such as the feasibility study
preliminary design
construction design
con-struction commissioning and operation optimization.This pa-per mainly focuses on the following aspects:electronic de-sign optimization steps
design optimization measures
hot spot and difficulties of optimization.Compare the reliability
flexibility
advancement
practicality
economic condition un-der the constraints of regulations.Thus
the cost of the proj-ect will be deduced and the company will get the maxi-mum profit by design optimization.