LI Zhen-qing, SHEN Liang, MA Dang-guo. Problems Analysis Based on the Secondary Circuit Voltage Test of the Main Transformer Voltage Transformer Commissioning Problem[J]. 2017, 38(1): 51-53.
DOI:
LI Zhen-qing, SHEN Liang, MA Dang-guo. Problems Analysis Based on the Secondary Circuit Voltage Test of the Main Transformer Voltage Transformer Commissioning Problem[J]. 2017, 38(1): 51-53. DOI: 10.3969/J.ISSN.2095-3429.2017.01.012.
Problems Analysis Based on the Secondary Circuit Voltage Test of the Main Transformer Voltage Transformer Commissioning Problem
摘要
某2×600MW煤机电厂调试过程中
对#1主变电压互感器进行二次回路升压试验
试验期间发现第三个绕组的空开MCB9未合
却在其下口产生电压。经过多组加量分析后
发现问题并进行消缺
整改后对第三个绕组再次进行二次回路升压试验
试验结果正确无误
保证了调试进程。
Abstract
In the process of commissioning a 2*600MW Coal-fired power plant
The secondary circuit voltage test of # 1 main transformer voltage transformer was carried out. During the test it was found that the vacuum switch MCB 9 of the third winding was not closed
but A voltage is generated at the non-charged side of the switch. After a number of experimental analysis
the problem was found and solved. The secondary circuit voltage test of # 1 main transformer voltage transformer is carried out again. The test results are correct