您当前的位置:
首页 >
文章列表页 >
基于JMD-ITD分解与Mamba2-MTransformer并行的超短期光伏功率点-区间预测
更新时间:2026-02-28
    • 基于JMD-ITD分解与Mamba2-MTransformer并行的超短期光伏功率点-区间预测

    • Vol. 53, Issue 12, Pages: 68-77(2025)
    • DOI:10.20204/j.sp.2025.12008    

      CLC: TM615
    • Published:2025

    移动端阅览

  • 崔曦文, 于霄宇, 高一波, et al. 基于JMD-ITD分解与Mamba2-MTransformer并行的超短期光伏功率点-区间预测[J]. 2025, 53(12): 68-77. DOI: 10.20204/j.sp.2025.12008.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

融合物理信息的光伏发电功率短期预测方法
Method for Breaking-closing Position Discrimination of Isolation Switch Based on Generative Adversarial Network and its Application
Modal truncation method to vibration analysis of the stator of ultrasonic motor
Research on High-Aspect-Ratio Micro and Small Hole Rapid EDM System
Development of a New High Integration Drive Modular for Scanning Mirror

Related Author

邹小龙
温步瀛
王怀远
WANG Bozhong
JIANG Yizhou
WEN Chao
DUAN Haoran
YI Jin

Related Institution

新能源发电与电能变换重点实验室(福州大学)
1. State Grid Hunan Electric Power Company Limited Maintenance Company
State Grid Hunan Electric Power Company Limited
Hunan Key Laboratory of Intelligent Information Analysis and Integrated Optimization for Energy Internet
State Grid Hunan Electric Power Research Institute
0