您当前的位置:
首页 >
文章列表页 >
Multi-timescale Optimal Scheduling Considering Data Center Load Characteristics
FEATURED FOCUS | 更新时间:2025-10-24
    • Multi-timescale Optimal Scheduling Considering Data Center Load Characteristics

    • Vol. 53, Issue 7, Pages: 1-10(2025)
    • DOI:10.20204/j.sp.2025.07001    

      CLC:
    • Published Online:20 July 2025,

      Published:20 July 2025

    移动端阅览

  • SHUAI Wenli, YANG Xiu, ZHAO Xiaoli, et al. Multi-timescale Optimal Scheduling Considering Data Center Load Characteristics[J]. 2025, 53(7): 1-10. DOI: 10.20204/j.sp.2025.07001.

  •  
  •  
查看原文

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on Relay Setting Data Center Based on the Splitting and Combination of CIM Model
Control Strategy of UPS for Data Center Based on Economic Dispatch
Energy Optimization Dispatch of Data Center Microgrid Based on Stochastic Model Predictive Control
Low-carbon Scheduling Strategy for Distributed Data Centers Considering Clean Energy and Energy Storage
Cooperative Operation Optimization Strategy for Different Geogra-phically Distributed Data Centers Considering Multiple Flexibility

Related Author

ZHANG Yong-hao
CHENG Gang
LI Jiang-hua
ZHENG Zhong
SI Yang
LI Xingbang
ZHU Yixin
ZONG Chenxi

Related Institution

1. School of Water Resources and Electric Power,Qinghai University
Qinghai Key Lab of Efficient Utilization of Clean Energy
(School of Internet of Things Engineering,Jiangnan University,,)
China Energy Construction Group Guangdong Electric Power Design and Research Institute Co., Ltd.
1. School of Automation,Guangdong University of Technology
0