您当前的位置:
首页 >
文章列表页 >
Assessment of Personal Safety Risks Around Transmission Line Towers and Structural Optimization of Grounding Devices
更新时间:2025-12-10
    • Assessment of Personal Safety Risks Around Transmission Line Towers and Structural Optimization of Grounding Devices

    • Vol. 53, Issue 6, Pages: 78-84(2025)
    • DOI:10.20204/j.sp.2025.06010    

      CLC:
    • Published:2025

    移动端阅览

  • ZHANG Yirui, TAO Jinsong, SHEN Zheng, et al. Assessment of Personal Safety Risks Around Transmission Line Towers and Structural Optimization of Grounding Devices[J]. 2025, 53(6): 78-84. DOI: 10.20204/j.sp.2025.06010.

  •  
  •  

0

Views

77

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Grounding Resistance Characteristics Analysis of Transmission Line Tower in Mountainous Regions
Research of Risk Assessment Model of Power Transformers Based on Fuzzy Mathematics
Power System Transient Instability Risk Assessment Based on Generator Curtailment Index
Transient Stability Risk Assessment Based on Risk Benefit Function
Risk Assessment Model of Cascading Failures in Power System Based on Identification of Critical Lines

Related Author

CHEN Liang
GUO Yanjun
TIAN Jun
TONG Jichun
YING Li-ming
ZHANG Guang-xin
LI Li
HUI Jianfeng

Related Institution

2.School of Electrical Engineering, Southwest Jiaotong University
Sichuan Electric Power Design & Consulting Co., Ltd.
Shaanxi Electric Power Corporation Power Dispatching and Communication Center
Northwest Electric Power Design Institute
North China Electric Power University
0