您当前的位置:
首页 >
文章列表页 >
菲律宾瓦瓦大坝施工导流设计与实践
更新时间:2025-12-08
    • 菲律宾瓦瓦大坝施工导流设计与实践

    • Sichuan Hydro Power   Vol. 44, Issue 3, Pages: 138-142(2025)
    • DOI:10.20196/j.cnki.scslfd.20250334    

      CLC: TV551.1
    • Published:2025

    移动端阅览

  • 周元, 任金明, 田迎春, et al. 菲律宾瓦瓦大坝施工导流设计与实践[J]. Sichuan Hydro Power, 2025, 44(3): 138-142. DOI: 10.20196/j.cnki.scslfd.20250334.

  •  
  •  

0

Views

13

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Construction Technology for The Second Stage River Closure at Nam Ou 2 Hydropower Station in Laos
宋农水电站施工导流设计的深化和优化
武都引水工程首部枢纽施工导流的设计与施工

Related Author

HUANG Zhijun
何荣凡
叶俊美

Related Institution

Sinohydro Bureau 10 Co., LTD
四川省水利电力工程局
0