Power load forecasting is particularly important for the planning and operation of the power grid
as it can help power grid companies to make reasonable scheduling of power resources
better balance power resources
and thus improve the economy and stability of the power system.This article proposes a multi-factor collaborative power load forecasting method based on Levenberg Marquardt(L-M)optimized backpropagation(BP)algorithm to address the shortcomings of existing algorithm optimized BP neural networks
such as poor accuracy and low convergence. On the basis of improving the BP algorithm
the L-M algorithm is used to integrate the steepest descent method and Gaussian Newton method to overcome the disadvantages of slow training
easy fall into local optima
and large prediction errors.Trainlm
Traingd
Trainrp
etc.
are used to train the L-M algorithm
considering factors that affect power loads such as temperature
air temperature
and date
and to predict power load in conjunction with cooling and heating loads.Finally
the effectiveness of the proposed method was verified using a residential community as an example.Compared with other methods
the L-M optimized BP algorithm for multi-factor collaborative power load forecasting performs well in solving nonlinear and complex forecasting problems with high accuracy