您当前的位置:
首页 >
文章列表页 >
基于TELEMAC-2D模型的浑江流域梯级水电站溃坝洪水风险分析
更新时间:2026-02-25
    • 基于TELEMAC-2D模型的浑江流域梯级水电站溃坝洪水风险分析

    • Vol. 43, Issue 10, Pages: 14-17(2025)
    • DOI:10.20040/j.cnki.1000-7709.2025.20242161    

      CLC: TV122.4
    • Published:2025

    移动端阅览

  • 杨忠兴, 李文雨, 初京刚, et al. 基于TELEMAC-2D模型的浑江流域梯级水电站溃坝洪水风险分析[J]. 2025, 43(10): 14-17. DOI: 10.20040/j.cnki.1000-7709.2025.20242161.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

84

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

溃坝洪水作用下河床侵蚀的SWE-SPH数值模拟研究
三江汇合口山区强弯河道洪水淹没研究
Reliability assessment of high-speed railway drivetrain based on matter-element model
Analysis of energy saving ratio in series hybrid electric bulldozer
Principle and experiment validation of roller tip-vanetype double-stator multi-speed motor

Related Author

田丽蓉
邵颂东
吴玉帅
顾声龙
林斌

Related Institution

青海大学土木水利学院
青海大学黄河上游生态保护与高质量发展实验室
青海大学水利部江河源区水生态治理与保护重点实验室
东莞理工学院生态环境与建筑工程学院
福建省水利水电勘测设计研究院有限公司
0