1.国能常州第二发电有限公司,江苏 常州 213001
2.河海大学机电工程学院,江苏 常州 213022
3.低碳智能燃煤发电与超净排放全国重点实验室(国家能源集团科学技术研究院有限公司),江苏 南京 210023
4.河海大学电气与动力工程学院,江苏 南京 211100
Received:30 June 2025,
Accepted:30 September 2025,
Published:15 August 2026
移动端阅览
张海峰,刘庆同,陈国庆,等.多台超超临界机组负荷分配及其综合能效分析[J].电力科技与环保,2026,42(4):582-590.
ZHANG Haifeng, LIU Qingtong, CHEN Guoqing, et al. Comprehensive energy efficiency analysis of multiple ultra-supercritical units and load distribution strategy[J]. Electric Power Technology and Environmental Protection, 2026, 42(4):582-590.
张海峰,刘庆同,陈国庆,等.多台超超临界机组负荷分配及其综合能效分析[J].电力科技与环保,2026,42(4):582-590. DOI: 10.19944/j.eptep.1674-8069.2026.04.007.
ZHANG Haifeng, LIU Qingtong, CHEN Guoqing, et al. Comprehensive energy efficiency analysis of multiple ultra-supercritical units and load distribution strategy[J]. Electric Power Technology and Environmental Protection, 2026, 42(4):582-590. DOI: 10.19944/j.eptep.1674-8069.2026.04.007.
目的
2
燃煤电厂厂级电负荷分配方式影响其经济性,为揭示某电厂多台超超临界机组能效特性的差异及电负荷分配对全厂经济性的影响,提出最优电负荷分配策略,以实现全厂运行节能增效。
方法
2
本文以某电厂一期2×1 000 MW超超临界一次再热机组和二期2×1 000 MW超超临界二次再热机组为对象,基于Ebsilon软件平台建立一、二期机组的热力系统模型,模拟纯凝工况下以5%为步长、30% THA~100% THA共15个负荷点时,一、二期机组的煤耗及热耗率变化规律。
结果
2
研究表明,在电负荷为300 MW至1 000 MW之间,一期机组煤耗率区间为277.1~310.9 g/(kW·h),最大差值为33.8 g/(kW·h);而二期机组煤耗率区间为266.8~297.6 g/(kW·h),最大差值为30.8 g/(kW·h)。低负荷时,单位电负荷变化对煤耗率的影响更显著。一期机组在低负荷下煤耗率降幅更大;高负荷时,二期机组经济性更优,2 200 MW总负荷下,一期多带负荷方案热耗率较二期低30.26 kJ/(kW·h)。
结论
2
机组负荷分配需动态优化,总负荷较低时优先由一期机组承担,随着总负荷升高需逐步增加二期机组负荷比例,高负荷时段由二期机组主导,可显著降低全厂煤耗。
Objective
2
The plant-level electric load distribution mode of coal-fired power plant affects its economy. In order to reveal the difference of energy efficiency characteristics of multiple ultra-supercritical units in a power plant and the influence of electric load distribution on the economy of the whole plant
the optimal electric load distribution strategy is proposed to realize the energy saving and efficiency increase of the whole plant operation.
Methods
2
In this paper
the 2 × 1 000 MW ultra-supercritical single-reheat unit in the first phase and the 2 × 1 000 MW ultra-supercritical double-reheat unit in the second phase of a power plant are taken as the object. Based on the Ebsilon software platform
the thermal system models of the first and second phase units are established. The variation of coal consumption and heat consumption rate of the first and second phase units is simulated under the condition of pure condensation with 5 % step size and 30%THA ~ 100%THA
a total of 15 load points.
Results
2
The results show that when the electric load is between 300 MW and 1 000 MW
the coal consumption rate of the first stage unit is 277.1 ~ 310.9 g/(kW·h)
and the maximum difference is 33.8 g/(kW·h). The coal consumption rate of the second phase unit is 266.8 ~ 297.6 g/(kW·h)
and the maximum difference is 30.8 g/(kW·h). At low load
the influence of unit electric load change on coal consumption rate is more significant. The coal consumption rate of the first-stage unit decreases more under low load ; under high load
the economy of the second-stage unit is better. Under the total load of 2 200 MW
the heat consumption rate of the first-stage multi-load scheme is 30.26 kJ/(kW·h) lower than that of the second-stage.
Conclusion
2
The load distribution of the unit needs to be dynamically optimized. When the total load is low
it is preferentially borne by the first-stage unit. As the total load increases
the load ratio of the second-stage unit needs to be gradually increased. The high-load period is dominated by the second-stage unit
which can significantly reduce the coal consumption of the whole plant.
刘志强 , 叶春 , 张源 , 等 . 煤电“三改联动”实施分析与措施建议 [J ] . 热力发电 , 2023 , 52 ( 5 ): 154 - 159 .
LIU Zhiqiang , YE Chun , ZHANG Yuan , et al . Analysis and suggestions on the implementation of “three-renovation” of coal-fired power [J ] . Thermal Power Generation , 2023 , 52 ( 5 ): 154 - 159 .
KAZDA K , LI X . A critical review of the modeling and optimization of combined heat and power dispatch [J ] . Processes , 2020 , 8 ( 4 ): 441 .
邵成成 , 冯陈佳 , 傅旭 , 等 . 多能源电力系统生产模拟:现状与挑战 [J ] . 中国电机工程学报 , 2021 , 41 ( 6 ): 2029 - 2040 .
SHAO Chengcheng , FENG Chenjia , FU Xu , et al . Multi energy power system production simulation: State of arts and challenges [J ] . Proceedings of the CSEE , 2021 , 41 ( 6 ): 2029 - 2040 .
张浩楠 . 面向碳中和的电力低碳转型规划与决策研究 [D ] . 北京 : 华北电力大学 , 2022 .
ZHANG Haonan . Research on low-carbon power transition planning and decision making aligned with China's carbon neutral target [D ] . Beijing : North China Electric Power University , 2022 .
朱法华 , 王玉山 , 徐振 , 等 . 中国电力行业碳达峰、碳中和的发展路径研究 [J ] . 电力科技与环保 , 2021 , 37 ( 3 ): 9 - 16 .
ZHU Fahua , WANG Yushan , XU Zhen , et al . Research on the development path of carbon peak and carbon neutrality in China’s Power Industry [J ] . Electric Power Technology and Environmental Protection , 2021 , 37 ( 3 ): 9 - 16 .
赵孟浩 , 沈亭 . 大容量空冷机组热电联产改造及供热能力分析 [J ] . 热力发电 , 2021 , 50 ( 3 ): 138 - 144 .
ZHAO Menghao , SHEN Ting . Combined heat and power generation transformation and heating capacity analysis of air cooling units with large capacity [J ] . Thermal Power Generation , 2021 , 50 ( 3 ): 138 - 144 .
中国电力企业联合会 . 中国电力行业年度发展报告2024 [R/OL ] . ( 2024-07-10 ) [ 2024-07-28 ] . https: //cec.org.cn/detail/index.html?3-334911 https://cec.org.cn/detail/index.html?3-334911 .
LIU H T , ZHAI R R , PATCHIGOLLA K , et al . Model predictive control of a combined solar tower and parabolic trough aided coal-fired power plant [J ] . Applied Thermal Engineering , 2021 , 193 : 116998 .
马小超 . 1 000 MW二次再热超超临界机组仿真及热经济性分析 [D ] . 北京 : 北京交通大学 , 2015 .
MA Xiaochao . Ation and thermal economy analysis of 1 000 MW ultra-supercritical unit with double reheat [D ] . Beijing : Beijing Jiaotong University , 2015 .
张斌 . 集中供热系统热惯性对供热机组调峰性能的影响研究 [D ] . 北京 : 华北电力大学 , 2021 .
ZHANG Bin . Study on influence of thermal inertia of central heating system on peak regulation performance of heating units [D ] . Beijing : North China Electric Power University , 2021 .
PETRAKOPOULOU F , TSATSARONIS G , MOROSUK T , et al . Conventional and advanced exergetic analyses applied to a combined cycle power plant [J ] . Energy , 2012 , 41 ( 1 ): 146 - 152 .
邓成刚 , 陈宇明 , 陈坤 , 等 . 50 MW超临界二氧化碳燃煤电厂热经济性分析 [J ] . 热力发电 , 2021 , 50 ( 12 ): 160 - 168 .
DENG Chenggang , CHEN Yuming , CHEN Kun , et al . Thermoeconomic analysis for 50 MW supercritical carbon dioxide coal-fired power plant [J ] . Thermal Power Generation , 2021 , 50 ( 12 ): 160 - 168 .
丁敬芝 . 两台700 MW电站的建模及其性能比较 [J ] . 武汉纺织大学学报 , 2014 , 27 ( 3 ): 78 - 81 .
DING Jingzhi . Modeling and performance comparison of two 700 MW power plants [J ] . Journal of Wuhan Textile University , 2014 , 27 ( 3 ): 78 - 81 .
丁敬芝 . 利用EBSILON软件为某700 MW热电站建模 [J ] . 华电技术 , 2014 , 36 ( 3 ): 17-20+31 + 79 .
DING Jingzhi . Modeling for a 700 MW heat and power plant using EBSILON software [J ] . Huadian Technology , 2014 , 36 ( 3 ): 17-20+31 + 79 .
ZHAO S F , WANG W S , GE Z H . Thermodynamic, operational, and techno-economic analysis of the cascade heating system with a double-unit [J ] . Energy Conversion and Management , 2020 , 226 : 113558 .
SOARES J , OLIVEIRA A C , VALENZUELA L . A dynamic model for once-through direct steam generation in linear focus solar collectors [J ] . Renewable Energy , 2021 , 163 : 246 - 261 .
阚伟民 , 宋景慧 , 周璐瑶 , 等 . 超超临界机组采用MC系统的变工况性能研究 [J ] . 热力发电 , 2014 , 43 ( 7 ): 41 - 44 .
KAN Weimin , SONG Jinghui , ZHOU Luyao , et al . Off-design performance of an ultra-supercritical power unit applying MC system [J ] . Thermal Power Generation , 2014 , 43 ( 7 ): 41 - 44 .
ZHAO S F , WANG W S , GE Z H . Energy and exergy evaluations of a combined heat and power system with a high back-pressure turbine under full operating conditions [J ] . Energies , 2020 , 13 ( 17 ): 4484 .
WANG C Y , LIU M , LI B X , et al . Thermodynamic analysis on the transient cycling of coal-fired power plants: Simulation study of a 660 MW supercritical unit [J ] . Energy , 2017 , 122 : 505 - 527 .
石慧 , 王洋 , 马汀山 , 等 . 多机组、多模式的热电联产厂级供热优化 [J ] . 热力发电 , 2022 , 51 ( 1 ): 123 - 129 .
SHI Hui , WANG Yang , MA Tingshan , et al . Plant-level heating optimization for multi-unit and multi-mode cogeneration [J ] . Thermal Power Generation , 2022 , 51 ( 1 ): 123 - 129 .
郭建 . 供热机组热电耦合特性与运行优化研究 [D ] . 南京 : 东南大学 , 2020 .
GUO Jian . Study on thermoelectric coupling characteristics and operation optimization of heating unit [D ] . Nanjing : Southeast University , 2020 .
卫治廷 . 供热机组灵活性改造及机组负荷优化分配研究 [D ] . 杭州 : 浙江大学 , 2022 .
WEI Zhiting . Research on flexible transformation and load optimization distribution of heating units [D ] . Hangzhou : Zhejiang University , 2022 .
刘金恺 , 鹿院卫 , 魏海姣 , 等 . 熔盐储热辅助燃煤机组调峰系统设计及性能对比 [J ] . 热力发电 , 2023 , 52 ( 2 ): 111 - 118 .
LIU Jinkai , LU Yuanwei , WEI Haijiao , et al . Design and performance comparison of peak shaving system of coal-fired unit aided by molten salt heat storage [J ] . Thermal Power Generation , 2023 , 52 ( 2 ): 111 - 118 .
MOLLENHAUER E , CHRISTIDIS A , TSATSARONIS G . Evaluation of an energy- and exergy-based generic modeling approach of combined heat and power plants [J ] . International Journal of Energy and Environmental Engineering , 2016 , 7 ( 2 ): 167 - 176 .
CHAUDHARY A S , THORIN E , YAN J Y . Opportunities and limitations for existing CHP plants to integrate polygeneration of drop-in biofuels with onsite hydrogen production [J ] . Energy Conversion and Management , 2020 , 221 : 113109 .
WU J , WANG J , LIU Y . Thermodynamic and economic analysis of a gas-turbine combined heat and power plant considering operational flexibility [J ] . Energy & Fuels , 2020 , 34 ( 11 ): 14902 - 14914 .
张元哲 , 刘培 , 李政 . 基于主导因素法的燃气轮机机理数据混合建模 [J ] . 工程热物理学报 , 2021 , 42 ( 11 ): 2787 - 2795 .
ZHANG Yuanzhe , LIU Pei , LI Zheng . Hybrid modeling of gas turbine based on dominant factors method [J ] . Journal of Engineering Thermophysics , 2021 , 42 ( 11 ): 2787 - 2795 .
雷杨祥 , 刘培 , 李政 . 基于运行数据的加热器主导因素建模 [J ] . 工程热物理学报 , 2022 , 43 ( 2 ): 304 - 308 .
LEI Yangxiang , LIU Pei , LI Zheng . Heater dominant factor modeling based on operation data [J ] . Journal of Engineering Thermophysics , 2022 , 43 ( 2 ): 304 - 308 .
韦杏秋 , 陈碧云 , 陈绍南 . 基于改进多种群遗传算法的节能环保多目标优化模型 [J ] . 电网与清洁能源 , 2013 , 29 ( 12 ): 22 - 29 .
WEI Xingqiu , CHEN Biyun , CHEN Shaonan . Multi-objective optimization model based on improved multiple population genetic algorithm considering energy conservation and environmental protection [J ] . Power System and Clean Energy , 2013 , 29 ( 12 ): 22 - 29 .
聂涛 , 邵峰 , 杨文正 , 等 . 火电机组在线能耗监测模型的分析研究 [J ] . 湖南电力 , 2023 , 43 ( 2 ): 60 - 65 .
NIE Tao , SHAO Feng , YANG Wenzheng , et al . Analysis and research of on-line energy consumption monitoring model for thermal power units [J ] . Hunan Electric Power , 2023 , 43 ( 2 ): 60 - 65 .
颜正 , 赵川 , 陈小兵 . 基于燃烧空气及烟气量的燃煤机组标准煤耗率计量方法 [J ] . 热力发电 , 2020 , 49 ( 2 ): 83 - 87 .
YAN Zheng , ZHAO Chuan , CHEN Xiaobing . Method for measuring standard coal consumption rate of coal-fired units based on combustion air and flue gas quantity [J ] . Thermal Power Generation , 2020 , 49 ( 2 ): 83 - 87 .
白博博 , 石奇光 , 沈阳 , 等 . 火电机组除氧器排汽对供电煤耗率的定量影响 [J ] . 汽轮机技术 , 2019 , 61 ( 2 ): 146 - 150 .
BAI Bobo , SHI Qiguang , SHEN Yang , et al . Steam discharge of thermal power unit deaerator to the quantitative effection of the coal consumption proportion [J ] . Turbine Technology , 2019 , 61 ( 2 ): 146 - 150 .
李勇 , 卢丽坤 , 王艳红 , 等 . 不同标准锅炉热效率及其对发电煤耗率的影响 [J ] . 中国电力 , 2012 , 45 ( 7 ): 34 - 37 .
LI Yong , LU Likun , WANG Yanhong , et al . Boiler heat efficiency by different standards and its influence on gross coal consumption rate [J ] . Electric Power , 2012 , 45 ( 7 ): 34 - 37 .
0
Views
0
下载量
0
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution
京公网安备11010802024621