Calculation and Analysis for the Safety of High-temperature Heating Surface of a 700 MW Ultra-supercritical CFB Boiler Without an External Bed After Plant Operation Total Power Failure
|更新时间:2026-10-10
|
Calculation and Analysis for the Safety of High-temperature Heating Surface of a 700 MW Ultra-supercritical CFB Boiler Without an External Bed After Plant Operation Total Power Failure
Chinese Journal of Power EngineeringVol. 45, Issue 11, Pages: 1767-1776(2025)
Calculation and Analysis for the Safety of High-temperature Heating Surface of a 700 MW Ultra-supercritical CFB Boiler Without an External Bed After Plant Operation Total Power Failure
Taking a 700 MW ultra-supercritical circulating fluidized bed (CFB) boiler without an external fluidized bed as the research object
the temperature variations across heating surfaces in the furnace and the rear flue gas pass were analyzed and calculated. A flow and heat transfer model for heating surfaces after a power failure accident was established
while the heat load calculation model for each heating surface was optimized. Based on above researches
a computational program for transient heat transfer in heating surfaces of boiler after a power failure accident was developed. Through computational analysis
the variations of thermal parameters such as working fluid temperature and tube wall temperature in each heating surface after power failure
were obtained. Without an emergency supplementing water water pump
only the high-temperature reheater experienced a transient overtemperature
while the overtemperature exhibited a minimal magnitude and a short duration
posing no safety risks to heating surfaces. Considering the high construction costs of emergency supplementing water pump and comprehensive economic evaluations
this CFB boiler does not require an installation of emergency supplementing water pump.
关键词
Keywords
references
吕俊复, 周托, 张扬, 等. 碳中和目标下循环流化床锅炉技术的展望[J]. 动力工程学报, 2022, 42(11): 1005-1012. L Junfu, ZHOU Tuo, ZHANG Yang, et al. Prospect of the circulating fluidized bed boiler technology for the goal of carbon neutralization[J]. Journal of Chinese Society of Power Engineering, 2022, 42(11): 1005-1012.
高建强, 宋铜铜, 张雪. 循环流化床锅炉机组碳排放特性分析与计算[J]. 动力工程学报, 2021, 41(1): 14-21. GAO Jianqiang, SONG Tongtong, ZHANG Xue. Analysis and calculation on carbon emission characteristics of CFB boiler units[J]. Journal of Chinese Society of Power Engineering, 2021, 41(1): 14-21.
辛胜伟, 张缦, 王君峰, 等. 大型循环流化床锅炉外置式换热器关键技术研究[J]. 洁净煤技术, 2020, 26(3): 120-125. XIN Shengwei, ZHANG Man, WANG Junfeng, et al. Research on key technology of external heat exchanger in the large-scale circulating fluidized bed boiler[J]. Clean Coal Technology, 2020, 26(3): 120-125.
王学深, 辛胜伟, 甘政, 等. 世界首台600 MW超临界循环流化床锅炉机组超低排放改造[J]. 洁净煤技术, 2023, 29(增刊2): 505-509. WANG Xueshen, XIN Shengwei, GAN Zheng, et al. Ultra-low emission modification of 600 MW supercritical circulating fluidized bed boilers unit[J]. Clean Coal Technology, 2023, 29(Sup2): 505-509.
张文清, 孙思聪, 卢啸风. 大型循环流化床锅炉外置式换热器运行特性的对比研究[J]. 热能动力工程, 2017, 32(增刊1): 97-101, 132-133. ZHANG Wenqing, SUN Sicong, LU Xiaofeng. Comparative study on the external heat exchanger operating characteristics in large-scale circulating fluidized bed boiler[J]. Journal of Engineering for Thermal Energy and Power, 2017, 32(Sup1): 97-101, 132-133.
CAI Runxia, ZHANG Man, MO Xin, et al. Operation characteristics of external heat exchangers in the 600 MW supercritical CFB boiler[J]. Fuel Processing Technology, 2018, 172: 65-71.
聂立, 蔡润夏, 鲁佳易, 等. 循环流化床外置换热器壁温偏差改进措施[J]. 浙江大学学报(工学版), 2021, 55(3): 578-585. NIE Li, CAI Runxia, LU Jiayi, et al. Improvements of non-uniform distribution of tube wall temperatures in circulating fluidized bed boiler's external heat exchangers[J]. Journal of Zhejiang University (Engineering Science), 2021, 55(3): 578-585.
陈鸿伟, 黑成浩, 王俊武, 等. 基于CPFD方法的660 MW超临界CFB锅炉循环回路均匀性研究[J]. 动力工程学报, 2023, 43(1): 24-33. CHEN Hongwei, HEI Chenghao, WANG Junwu, et al. Study on the uniformity of circulating loop in a 660 MW supercritical CFB boiler based on CPFD method[J]. Journal of Chinese Society of Power Engineering, 2023, 43(1): 24-33.
张文杰, 赵四方, 程伟, 等. 超超临界循环流化床锅炉外置换热器壁温偏差研究[J]. 山东电力技术, 2021, 48(1): 59-63. ZHANG Wenjie, ZHAO Sifang, CHENG Wei, et al. Investigation on wall temperature deviation of ultra supercritical CFB boiler's external heat exchangers[J]. Shandong Electric Power, 2021, 48(1): 59-63.
巩李明, 邓启刚, 刘杰, 等. 东方700 MW高效超超临界CFB锅炉的开发[J]. 东方电气评论, 2021, 35(3): 58-62. GONG Liming, DENG Qigang, LIU Jie, et al. Development of 700 MW high efficiency ultra-supercritical CFB boiler[J]. Dongfang Electric Review, 2021, 35(3): 58-62.
冯福媛, 郑淇薇, 陈衡, 等. 深度调峰背景下火电机组变负荷过程蒸汽参数反馈特性[J]. 洁净煤技术, 2023, 29(6): 59-64. FENG Fuyuan, ZHENG Qiwei, CHEN Heng, et al. Feedback characteristics of steam parameters during load variation in thermal power units in the context of deep peaking[J]. Clean Coal Technology, 2023, 29(6): 59-64.
张圆圆, 张普森, 聂浩, 等. 火电机组蒸汽工质侧快速变负荷方法研究进展[J]. 洁净煤技术, 2023, 29(6): 49-58. ZHANG Yuanyuan, ZHANG Pusen, NIE Hao, et al. Research progress of fast variable load method on steam working medium side of thermal power unit[J]. Clean Coal Technology, 2023, 29(6): 49-58.
孙倩, 印江, 牛斌, 等. 300 MW亚临界循环流化床发电机组的全程调峰控制研究[J]. 电力学报, 2020, 35(6): 522-527, 562. SUN Qian, YIN Jiang, NIU Bin, et al. Research on full-process peak regulation control of 300 MW subcritical circulating fluidized bed generator set[J]. Journal of Electric Power, 2020, 35(6): 522-527, 562.
邓博宇, 张缦, 李少华, 等. 失电事故下350 MW超临界CFB锅炉水冷壁安全性分析[J]. 中国电机工程学报, 2019, 39(16): 4799-4807. DENG Boyu, ZHANG Man, LI Shaohua, et al. Analysis on the safety of the water wall in a 350 MW supercritical CFB boiler under electricity failure condition[J]. Proceedings of the CSEE, 2019, 39(16): 4799-4807.
李银龙, 董乐, 牛田田, 等. 660 MW超临界CFB锅炉机组跳闸后受热面安全性计算分析[J]. 中国电机工程学报, 2021, 41(17): 5957-5966. LI Yinlong, DONG Le, NIU Tiantian, et al. Calculation and analysis on the safety of heating surfaces for a 660 MW supercritical CFB boiler under boiler trip[J]. Proceedings of the CSEE, 2021, 41(17): 5957-5966.
周旭, 周妍君, 李维成, 等. 660 MW超超临界CFB锅炉失电壁温计算及运行措施[J]. 洁净煤技术, 2023, 29(11): 91-98. ZHOU Xu, ZHOU Yanjun, LI Weicheng, et al. Calculation of heating surface wall temperature and operation measures for 660 MW ultra supercritical CFB boiler under electricity failure[J]. Clean Coal Technology, 2023, 29(11): 91-98.
李银龙, 杨冬, 李维成, 等. 660 MW超超临界CFB锅炉失电事故下受热面安全性分析及紧急补水泵选型[J]. 动力工程学报, 2022, 42(5): 393-401, 412. LI Yinlong, YANG Dong, LI Weicheng, et al. Safety analysis of heating surfaces and selection of emergency water supply pump for a 660 MW ultra-supercritical CFB boiler under power failure condition[J]. Journal of Chinese Society of Power Engineering, 2022, 42(5): 393-401, 412.
张宏涛, 徐冰, 白玉星, 等. 钢混凝土界面接触热阻试验研究[J]. 土木建筑与环境工程, 2015, 37(2): 34-38. ZHANG Hongtao, XU Bin, BAI Yuxing, et al. Experimental analysis of interface thermal contact resistance between steel and concrete[J]. Journal of Civil, Architectural & Environmental Engineering, 2015, 37(2): 34-38.
牛田田, 张伟强, 辛胜伟, 等. 超临界循环流化床锅炉屏式过热器吸热量偏差特性研究[J]. 中国电机工程学报, 2022, 42(6): 2227-2237. NIU Tiantian, ZHANG Weiqiang, XIN Shengwei, et al. Study on the heat absorption deviation characteristics of the platen superheaters in the supercritical circulating fluidized bed boiler[J]. Proceedings of the CSEE, 2022, 42(6): 2227-2237.
黄永志. 循环流化床锅炉水动力特性研究[D]. 上海: 上海交通大学, 2016.
邓启刚, 吕卓, 石友, 等. 不带外置床的700 MW超超临界循环流化床锅炉失电后水冷壁安全计算分析[J]. 发电技术, 2024, 45(2): 240-249. DENG Qigang, L Zhuo, SHI You, et al. Safety calculation and analysis of water wall for a 700 MW ultra-supercritical circulating fluidized bed boiler without external bed after power failure[J]. Power Generation Technology, 2024, 45(2): 240-249.