您当前的位置:
首页 >
文章列表页 >
A multi-timescale-based early fault monitoring method for wind turbine gearboxes
更新时间:2026-09-28
    • A multi-timescale-based early fault monitoring method for wind turbine gearboxes

    • Power System Protection and Control   Vol. 54, Issue 19, (2026)
    • DOI:10.19783/j.cnki.pspc.260282    

      CLC:
    • Published:2026

    移动端阅览

  • ZHANG Cheng, LEI Buchen, YU Shilin, et al. A multi-timescale-based early fault monitoring method for wind turbine gearboxes[J]. Power System Protection and Control, 2026, 54(19). DOI: 10.19783/j.cnki.pspc.260282.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

考虑噪声影响的电动汽车动力电池SOH和RUL联合估计
基于机组动态分类的风电场一次调频协调控制算法
基于随机冲击和多状态劣化的风电机组组合维修策略
风电机组一次调频对载荷的影响分析及综合惯量控制优化方法研究
Large‑scale photovoltaic dynamic prediction peak shaving strategy based on communication topology optimization

Related Author

ZHANG Xin
XU Zunyi
HE Huiru
WANG Fei
SUN Liming
GUO Ke
DAI Xuan
ZHANG Binbin

Related Institution

CAI Liyuan(1. Students Administration Department, Xi’an Technological University
School of Cryptography Engineering, Armed Police Engineering University
LIN Shunfu(1. College of Electrical Engineering, Shanghai University of Electric Power
North Power Supply Branch, State Grid Shanghai Electric Power Company
SGIDI Engineering Consulting (Group) Co., Ltd.,,)
0