LI Xincong, HUANG Ying, LI Zhenkun, et al. Optimal Operation and Profit Allocation of Virtual Power Plants Based on Conditional Value-at-risk[J]. 2025, (6): 1170-1181.
DOI:
LI Xincong, HUANG Ying, LI Zhenkun, et al. Optimal Operation and Profit Allocation of Virtual Power Plants Based on Conditional Value-at-risk[J]. 2025, (6): 1170-1181. DOI: 10.19725/j.cnki.1007-2322.2023.0263.
Optimal Operation and Profit Allocation of Virtual Power Plants Based on Conditional Value-at-risk
虚拟电厂(virtual power plant,VPP)作为解决可再生能源并网的技术途径,可有效帮助各类分布式能源参与电力市场交易并提高整体竞争力与经济性。为此文中提出了一种聚合多类分布式能源的VPP运营策略及其内部成员的收益分配方法。首先,构建了由风电机组、燃气机组、储能设备和可中断负荷组成的VPP优化运行模型,并运用条件风险价值理论对不确定因素风险进行量化处理,得到了不同风险水平下VPP的运营策略和收益;接着,基于内部各成员的风险水平、收益贡献和成员吸引力,采用权重系数改进Shapley值法,提出了适用于多个成员的VPP收益分配模型;最后,以某VPP为研究对象进行算例分析,验证了所建模型的有效性,确保了收益分配结果的公平性与合理性,对各类分布式能源参与到VPP起到积极作用,对维护VPP联盟的稳定具有重要意义。
Abstract
Virtual power plants (VPP) serve as a solution for the seamless integration of renewable energy sources into the grid
effectively facilitating participation in electricity market transactions by various types of distributed energy resources and thus improving overall competitiveness and economic viability. In this article
we propose a VPP operating strategy that aggregates multiple types of distributed energy resources
along with a method for profit allocation among its internal members. Firstly
we construct an optimized VPP operating model composed of wind turbine
gas turbine
energy storage equipment
and interruptible loads. We employ conditional value-at-risk theory to quantify the risk of uncertain factors
and derive VPP operating strategies and profits under different risk levels. Secondly
we improve the Shapley value method with weighted coefficients to develop a VPP profit allocation model that applies to multiple members
based on the risk levels
profit contributions
and member attractiveness of internal members. Finally
we utilize a VPP as a case study to analyze the effectiveness of the model. The fairness and reasonableness of profit allocation results are ensured
which plays a positive role in the participation of various types of distributed energy resources in the VPP and is also of great significance to maintaining the stability of the VPP alliance.
关键词
Keywords
references
KARDAKOS E G, SIMOGLOU C K, BAKIRTZIS A G. Optimal offering strategy of a virtual power plant: A stochastic bi-level approach[J]. IEEE Transactions on Smart Grid, 2015, 7(2): 794−806.
NOSRATABADI S M, HOOSHMAND R A, GHOLIPOUR E. A comprehensive review on microgrid and virtual power plant concepts employed for distributed energy resources scheduling in power systems[J]. Renewable and Sustainable Energy Reviews, 2017, 67: 341−363.
ZHAO Bo, WANG Xiangjin, ZHANG Xuesong, et al. Two-layer method of microgrid optimal sizing considering demand-side response and uncertainties[J]. Transactions of China Electrotechnical Society, 2018, 33(14): 3284−3295(in Chinese).
NGUYEN H T, LE L B, WANG Z. A bidding strategy for virtual power plants with the intraday demand response exchange market using the stochastic programming[J]. IEEE Transactions on Industry Applications, 2018, 54(4): 3044−3055.
LUI Siyuan, AI Qian, ZHENG Jianping, et al. Bi-level coordination mechanism and operation strategy of multi-time scale multiple virtual power plants[J]. Proceedings of the CSEE, 2018, 38(03): 753−761(in Chinese).
EMARATI M, KEYNIA F, RASHIDINEJAD M. A two-stage stochastic programming framework for risk-based day-ahead operation of a virtual power plant[J]. International Transactions on Electrical Energy Systems, 2020, 30(3): e12255.
RIVEROS J Z, BRUNINX K, PONCELET K, et al. Bidding strategies for virtual power plants considering CHPs and intermittent renewables[J]. Energy Conversion and Management, 2015, 103: 408−418.
SUN Jingqi, WANG Yuan, GUO Xiaohui, et al. Optimal operation of virtual power plant considering environmental externality and output uncertainty of wind and photovoltaic power[J]. Automation of Electric Power Systems, 2022, 46(08): 50−59(in Chinese).
ZHANG Y, LIU F, WANG Z, et al. Robust scheduling of virtual power plant under exogenous and endogenous uncertainties[J]. IEEE Transactions on Power Systems, 2021, 37(2): 1311−1325.
BARINGO A, BARINGO L, ARROYO J M. Day-ahead self-scheduling of a virtual power plant in energy and reserve electricity markets under uncertainty[J]. IEEE Transactions on Power Systems, 2018, 34(3): 1881−1894.
WEI Zhinong, CHEN Yu, HUANG Wenjin, et al. Optimal allocation model for multi-energy capacity of virtual power plant considering conditional value-at-risk[J]. Automation of Electric Power Systems, 2018, 42(04): 39−46(in Chinese).
LI Yating, TANG Jiajun, ZHANG Si, et al. Decision-making model of electricity procurement and sale for electricity retailers considering multiple uncertain factors[J]. Automation of Electric Power Systems, 2022, 46(07): 33−41(in Chinese).
TAN Z, LI H, JU L, et al. Joint scheduling optimization of virtual power plants and equitable profit distribution using shapely value theory[J]. Mathematical Problems in Engineering, 2018:1-13.
HU Diangang, LIU Yiran, WANG Kunyu, et al. Joint bidding and distribution strategies for multiple commercial virtual power plants[J]. Power System Technology, 2016, 40(05): 1550−1557(in Chinese).
GUO Hongxia, GAO Rui, YANG Ping. Two-stage dispatch of microgrid based on CVaR theory under electricity spot market[J]. Power System Technology, 2019, 43(08): 2665−2674(in Chinese).
CHEN Xingying, YU Qingyun, XIE Jun, et al. DLMP calculation based on power loss and emission reduction allocation using Aumann-Shapley method[J]. Electric Power Automation Equipment, 2019, 39(04): 17−23(in Chinese).
CHENG Y, FAN S, NI J, et al. An innovative profit allocation to distributed energy resources integrated into virtual power plant[C]//International Conference on Renewable Power Generation (RPG 2015). IET, 2015: 1-6.
LU Dan, YUAN Yue. Weak part identification based on fault-tree Monte Carlo simulation for islanded micr-ogrid[J]. Electric Power Automation Equipment, 2017, 37(04): 38−44(in Chinese).
MA Xiufan, YU Siyu, ZHU Sijia, et al. Profit allocation to virtual power plant members based on improved multifactor Shapley value method[J]. Transactions of China Electrotechnical Society, 2020, 35(S2): 585−595(in Chinese).
CHEN Yunxiang, DONG Xiaoxiong, XIANG Huachun, et al. Method for combination weighting experts based on information entropy and cluster analysis[J]. Chinese Journal of Management Science, 2015, 23(06): 142−146(in Chinese).