您当前的位置:
首页 >
文章列表页 >
Power Load Forecasting in Station Areas Based on ASGMD-MLR-CLSTM
Electricity Market | 更新时间:2025-12-17
    • Power Load Forecasting in Station Areas Based on ASGMD-MLR-CLSTM

    • “In the field of power load forecasting, experts have proposed a forecasting method based on ASGMD, MLR, and CLSTM, which improves the accuracy of forecasting and provides a solution for power safety and stable economic operation.”
    • Modern Electric Power   Vol. 42, Issue 4, Pages: 840-846(2025)
    • DOI:10.19725/j.cnki.1007-2322.2023.0112    

      CLC: TM76
    • Received:28 March 2023,

      Accepted:08 August 2023,

      Published:10 August 2025

    移动端阅览

  • Lei FANG, Chengbo CHU, Yinghong HE, et al. Power Load Forecasting in Station Areas Based on ASGMD-MLR-CLSTM[J]. Modern Electric Power, 2025, 42(4): 840-846. DOI: 10.19725/j.cnki.1007-2322.2023.0112.

  •  
  •  

0

Views

49

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Short-term Household Load Forecasting Based on State Frequency Memory Network

Related Author

Xiangguo BU
Bo LAI
Houpan ZHOU

Related Institution

School of Automation, Hangzhou Dianzi University
0