Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit[J]. Thermal power generation, 2025, 54(7): 63-70.
DOI:
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit[J]. Thermal power generation, 2025, 54(7): 63-70. DOI: 10.19666/j.rlfd.202503022.
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit
摘要
随着我国新能源发电装机规模的快速增长,煤电调峰能力不足的问题日益凸显。为了挖掘超临界循环流化床(circulating fluidized bed
With the rapid expansion of new energy power generation capacity in China
the insufficient load regulation capability of coal-fired power plants has become increasingly evident. In order to explore the start-stop peak regulation capability of supercritical circulating fluidized bed(CFB) power units
a 350 MW supercritical CFB unit was taken as the research object
and experimental studies on banked-fire hot standby and rapid start-stop operations were conducted. The experimental results demonstrated that the supercritical CFB unit can rapidly reduce its load to near zero(with an average load change rate of about 10%Pe/min) during bank firing
and then maintain hot standby for 108 minutes. After banked firing
the boiler quickly switched to wet-state operation
with the main steam pressure decreasing rapidly at a rate of 0.13 MPa/min. By reasonably controlling the feedwater flow
the working fluid temperature and wall temperature of the water-cooled walls and water-cooled panels were kept stable. The heat released from the combustion of residual carbon caused the bed temperature to decrease slowly during banked firing
which also provided favorable conditions for re-ignition. During the load lift phase
the unit could be quickly started
with NO_x emission mass concentration reaching an instantaneous peak of 101 mg/m~3
while the hourly average was stable below 50 mg/m~3. Throughout the entire experimental period
SO_2 emission mass concentration was consistently below 35 mg/m~3
and pollutant emissions met the ultra-low-emission requirements. All parameters of the steam turbine and generator remained within normal ranges during the hot standby and startup/shutdown. The rapid decline in main steam pressure and the low superheat of the main steam temperature were the main factors limiting the duration of banked firing in this experiment. The relevant research work provides a reference for the start-stop peak regulation of higher-parameter supercritical and ultra-supercritical CFB units.