Simulation modelling of power system for supercritical units considering dynamic heat exchange of once-through boiler
With the increasing proportion of new energy connected to the grid
the issue of frequency safety in the power system and mastering the regulation ability of the units have become more important. At present
in power system simulation
thermal power unit models suitable for electromechanical transient and medium-long term dynamics mainly adopt the simplified model of drum boilers and the single reheater turbine model recommended by IEEE. If a similar model is also used for the once-through boiler unit
the simulation results of the main steam pressure will deviate significantly from the actual situation due to the dynamic of thermal storage coefficient and the deviation of control system
which leads to a misjudgement of the unit's regulation ability. By using thermodynamic modeling methods
a supercritical once-through boiler unit model suitable for multi-time scale dynamic simulation is proposed. By establishing a moving boundary model of the water wall and a dynamic heat flow model of the superheater
the heat storage capacity of the once-through boiler can be reflected more accurately. By incorporating feedwater control and superheat control
the control system is more in line with the actual unit. The high simulation accuracy of the model is verified using power plant operation data. Compared with the existing power simulation models
the simulation accuracy of the main steam pressure has been improved significantly. Therefore
the model can describe the dynamics of supercritical once-through boiler units more accurately in primary and secondary frequency regulation and peak shaving
which is helpful for simulating the frequency process of power systems.
Energy saving automatic control with deeply pressure sliding based on condensate load adjustment technology
PRELIMINARY ANALYSIS OF REQUIREMENTS TO WATER-WALL SYSTEM PERFORMANCE FOR SERVICE OPERATION OF SUPERCRITICAL PRESSURE ONCETHROUGH BOILER OF 600MW UNITS
MATHEMATIC MODEL AND DYNAMIC CHARACTERISTICS OF ONCE-THROUGH BOILER FOR A 300 MW UNIT
EXPLORATION OF FEED-WATER AVT(O) TREATMENT FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600 MW UNIT
OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT
Related Author
GAO Lin
LI Erkan
XUE Jianzhong
GAO Haidong
TONG Bo
LI Xiaobo
XIE Jiang
CAI Dan
Related Institution
Huaneng Dandong Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Guangdong Electric Honghai Bay Power Generation Co., Ltd.