您当前的位置:
首页 >
文章列表页 >
Numerical simulation and optimization of defector installation in waste heat boiler of a combined cycle power plant
更新时间:2025-09-28
    • Numerical simulation and optimization of defector installation in waste heat boiler of a combined cycle power plant

    • Thermal Power Generation   Vol. 53, Issue 6, Pages: 106-113(2024)
    • DOI:10.19666/j.rlfd.202401022    

      CLC: TM611.31
    • Published:2024

    移动端阅览

  • CHEN Jun, SUN Yuzhu, PAN Cunhua, et al. Numerical simulation and optimization of defector installation in waste heat boiler of a combined cycle power plant[J]. Thermal power generation, 2024, 53(6): 106-113. DOI: 10.19666/j.rlfd.202401022.

  •  
  •  

0

Views

10

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

OPTIMIZATION OF DEFLECTOR AND SPRAY AMMONIA IN SCR SYSTEM
Process design of SNCR in integrated de-NOx transformation
Numerical modeling and optimal design of flow field for a wet electrostatic precipitator system
Deposition behavior of sulfuric acid vapor on heat exchanger surfaces
Numerical simulation on low NOx combustion of pulverized coal by low temperature pre-combustion

Related Author

TIAN Yingqing School of Environmental Science and Engineering
WANG Shan
SUN Yu
LI Yuan
HU Manyin
LIANG Yuchao
XU Guang1
ZHOU Wei1

Related Institution

College of Environmental Science and Engineering, North China Electric Power University
Beijing CEC Environmental Protection Engineering Co., Ltd
Sinopec Yangtze Petrochemical Branch
GE Energy,4 Park Plaza,Irvine,14
General Electric Company of China
0