您当前的位置:
首页 >
文章列表页 >
Optimization of automatic generation control response performance of flywheel-thermal power system based on load forecasting
更新时间:2025-09-28
    • Optimization of automatic generation control response performance of flywheel-thermal power system based on load forecasting

    • Thermal Power Generation   Vol. 52, Issue 5, Pages: 92-99(2023)
    • DOI:10.19666/j.rlfd.202209238    

      CLC: TM621;TP273
    • Published:2023

    移动端阅览

  • WEI Le, SU Shaoxin, FANG Fang, et al. Optimization of automatic generation control response performance of flywheel-thermal power system based on load forecasting[J]. Thermal power generation, 2023, 52(5): 92-99. DOI: 10.19666/j.rlfd.202209238.

  •  
  •  

0

Views

481

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF QUALITY DETERIORATION FOR FIRE RESISTANT OIL USED IN YIMIN POWER PLANT AND COUNTERMEASURES THEREOF
DEVELOPMENT OF SPARE SPACE FOR DISTRIBUTED CONTROL SYSTEM AND ITS APPLICATION IN ENGINEERING
SIMULATION OF UNIT COORDINATED CONTROL SYSTEM(UCCS) BASED ON SOFTWARE BLINK
APPLICATION OF NUMERICAL SIMULATION IN OPTIMIZED DESIGN OF DEMISTOR FOR WET DESULFURATION
ANALYSIS OF OPTIMIZED OPERATION POTENTIAL FOR THERMAL POWER UNITS

Related Author

BI Fa sen
YANG Hua
HU Baiyong
CHEN Hengzhong
JIANG Ai-qin
ZHANG Xue-jun
WANG Qi(Taiyuan Electric Power High Professional College
LI Wen-yan

Related Institution

Yimin Power Plant Hulunbuir
Jiaxing Power Generation Co., Ltd
Jiaxing Power Generation Co., Ltd.
Taiyuan Electric Power College
0