您当前的位置:
首页 >
文章列表页 >
Inaccuracy of boiler efficiency in design and test of turbine-boiler deeply coupled system and analysis of its influence on coal-saving benefits
更新时间:2025-09-28
    • Inaccuracy of boiler efficiency in design and test of turbine-boiler deeply coupled system and analysis of its influence on coal-saving benefits

    • Thermal Power Generation   Vol. 51, Issue 7, Pages: 61-71(2022)
    • DOI:10.19666/j.rlfd.202201005    

      CLC: TM621.2
    • Published:2022

    移动端阅览

  • ZHANG Jianzhong, CAO Liping, LI Zheng. Inaccuracy of boiler efficiency in design and test of turbine-boiler deeply coupled system and analysis of its influence on coal-saving benefits[J]. Thermal power generation, 2022, 51(7): 61-71. DOI: 10.19666/j.rlfd.202201005.

  •  
  •  

0

Views

36

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TEST STUDY ON COMBUSTION ADJUSTMENT OF BOILER FOR SUPERCRITICAL 600MW UNIT IN YANGZHOU POWER PLANT
MEASURES FOR ENHANCING EFFICIENCY OF CFB BOILERS UNDER LOW LOAD CONDITION
STUDY ON ON-LINE MONITORING SYSTEM FOR COGENERATION UNITS IN SHANDONG PROVINCE
TEST FOR OPERATION OPTIMIZATION OF CFB BOILERS MIXEDLY BURNING HIGH-SULPHUR PETROLEUM COKE WITH COAL
TEST STUDY ON MIXEDLY BURNING COAL SLIME IN 300MW CFB BOILER

Related Author

JIANG Jian-gang1
LI Yong-ling1
ZHANG Chun-fa21.Department of Power
WANG Shi-wen
GAO Li-hongLantian Thermal Power Co Ltd
SUN Wei1
SHANG Li2
LIU Ji-dong2

Related Institution

Department of Power Engineering, North China Electric Power University
Power Department of Baoding Electric Power Vocational and Technical College
Blue Sky Thermal Power Co., Ltd
Shandong Electric Power Corporation
Shandong Electric Power Research Institute
0