Real time calculation method of clustering extremum based on graph configuration
更新时间:2025-09-28
    • Real time calculation method of clustering extremum based on graph configuration

    • Thermal Power Generation   Vol. 51, Issue 3, Pages: 187-190(2022)
    • DOI:10.19666/j.rlfd.202201002    

      CLC: TM62;TP311.13
    • Published:2022

    移动端阅览

  • SONG Meiyan, WANG Yanchu, LIU Pei, et al. Real time calculation method of clustering extremum based on graph configuration[J]. Thermal power generation, 2022, 51(3): 187-190. DOI: 10.19666/j.rlfd.202201002.

  •  
  •  

0

Views

44

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

REALIZATION OF INTEGRATED WDPF TYPE DCS CONTROL FOR HEATSUPPLYING POWERGENERATING UNIT WITH FLUIDIZED BED
METHOD FOR SETTING THE SOE NETWORK TIME CLOCK SYNCHRONIZATION IN DCS OF THERMAL POWER PLANT
CHECK-OUT TEST OF PERFORMANCE FOR DCS IN THERMAL POWER PLANT AND RELIABILITY ANALYSIS THEREOF
TECHNOLOGY FOR REALIZATION OF THREE-DIMENSIONAL TEMPERATURE FIELD TO BE VISUALIZED IN DCS
REALIZING EMULATION OF DCS FAULT BY USING AN EMULATOR

Related Author

CHEN Xiuping
QIAO Zhengyu
XIONG Kai
WEI Dong-liang
YIN Feng
ZHOU Huai-chun~1
YANG Chao~1
FU Pei-fang~1

Related Institution

Shaanxi Shenmu
Daliuta Thermal Power Plant Shaanxi Shenmu
Daliuta Thermal Power Plant
Honghai Bay Power Generation Co., Ltd
Zhejiang Energy Group Co., Ltd
0