Optimization of back pressure operation of 600 MW direct air-cooled unit based on random forest
更新时间:2025-09-28
    • Optimization of back pressure operation of 600 MW direct air-cooled unit based on random forest

    • Thermal Power Generation   Vol. 50, Issue 7, Pages: 100-107(2021)
    • DOI:10.19666/j.rlfd.202011288    

      CLC: TM621
    • Published Online:31 December 2021,

      Published:2021

    移动端阅览

  • AN Liuming, NIE Chunming, CHEN Heng, et al. Optimization of back pressure operation of 600 MW direct air-cooled unit based on random forest[J]. Thermal power generation, 2021, 50(7): 100-107. DOI: 10.19666/j.rlfd.202011288.

  •  
  •  

0

Views

410

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Adjustment of loop seal in CFB boilers
Operation optimization for retrofitted 1025 t/h boiler and experimental study on its NOx emission
Experimental study on economical efficiency of high proportion lignite blended combustion in a large scale CFB boiler
Optimization of bed pressure and its upper pressure difference for a 300 MW CFB boiler
Design optimization for distributed combined heat and power cogeneration systems:research progress

Related Author

WANG Zhiwei1
CHEN Wenyue2
NI Jiao2
LIU Yuan2
CHEN Yong3
WANG Pengli1 1.Xi'an Thermal Power Research Institute Co.
LIANG Ligang1
MENG Yong1

Related Institution

Wuhan Kaidi Electric Power Co., Ltd
Honghe Chemical Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Inner Mongolia Electric Power Research Institute
Sichuan Baima Circulating Fluidized Bed Demonstration Power Station Co., Ltd
0