您当前的位置:
首页 >
文章列表页 >
Performance test method for unit suffering deep coupling of turbine and boiler
更新时间:2025-09-28
    • Performance test method for unit suffering deep coupling of turbine and boiler

    • Thermal Power Generation   Vol. 49, Issue 12, Pages: 95-99(2020)
    • DOI:10.19666/j.rlfd.202005021    

      CLC: TK223.3
    • Published Online:01 December 2020,

      Published:2020

    移动端阅览

  • WANG Zhucheng, HU Fanglou, HAN Guoqing, et al. Performance test method for unit suffering deep coupling of turbine and boiler[J]. Thermal power generation, 2020, 49(12): 95-99. DOI: 10.19666/j.rlfd.202005021.

  •  
  •  

0

Views

82

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Influence of measurement and estimation of heat loss on efficiency of CFB boiler
Difference in boiler efficiency calculation between ASME PTC4.1—1964 and ASME PTC4—2013
STUDY ON THE PARTIAL QUANTITATIVE ANALYSIS METHOD USED IN CONVENTIONAL PERFORMANCE TEST OF STEAM TURBINES
PROCESSING METHODS FOR CONDITION CURVES OF LOW-PRESSURE CYLINDER IN TURBINE PERFORMANCE ACCEPTANCE TEST
CAUSE ANALYSIS OF HIGH EXHAUST STEAM PARAMETERS FROM HIGH-PRESSURE CYLINDER OF HOME-MADE 135 MW STEAM TURBINE

Related Author

JIAO Tongshuai
YAN Weiping
CAO Ying
CHEN Xin
WANG Hua
WANG Zhucheng
MENG Guixiang
YAO Sheng

Related Institution

College of Energy, Power and Mechanical Engineering, North China Electric Power University
Shandong Special Equipment Inspection and Research Institute Jining Branch
Hebei Electric Power Research Institute
North China Electric Power University
North China Electric Power Design Institute Engineering Co., Ltd
0