您当前的位置:
首页 >
文章列表页 >
Design of automatic control of auxiliary frequency modulation for cylinder bypass valve in thermal power plant
更新时间:2025-09-28
    • Design of automatic control of auxiliary frequency modulation for cylinder bypass valve in thermal power plant

    • Thermal Power Generation   Vol. 49, Issue 9, Pages: 109-113(2020)
    • DOI:10.19666/j.rlfd.202004107    

      CLC: TK323
    • Published Online:15 August 2020,

      Published:2020

    移动端阅览

  • ZHANG Jing, YANG Chaojie, WANG Qi, et al. Design of automatic control of auxiliary frequency modulation for cylinder bypass valve in thermal power plant[J]. Thermal power generation, 2020, 49(9): 109-113. DOI: 10.19666/j.rlfd.202004107.

  •  
  •  

0

Views

66

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DEVELOPMENT AND APPLICATION OF ELECTRIC ACTUATOR IN THE AUTOMATIC CONTROL SYSTEMS
BED-OVERTURN PHENOMENON OF UNDERPANTS LEG IN 300 MW CFB BOILER AND REMEDIAL METHOD THEREOF
OPTIMIZATION OF AUTOMATIC CONTROL STRATEGY UNDER ABNORMAL OPERATING CONDITIONS OF SUBCRITICAL UNITS
CONTROL OF BYPASS SYSTEM FOR STEAM TURBINE OF M701F GAS-STEAM COMBINED CYCLE UNIT UNDER SPECIAL OPERATING CONDITIONS
PROBLEM ANALYSIS AND CONTROL OPTIMIZATION OF MAIN AUTOMATIC PROTECTION FACILITIES IN THE FGD SYSTEM

Related Author

GAO Wen-yan~2(1.Guohua Ninghai Power Plant
HE Zeng-yao~1
JIANG Mao-qingSichuan Baima CFB Demonstration Power Plant Co Ltd
ZHOU Si-lin
WU Yu-ping
HUANG Zhenxin Huaneng Tongchuan Power Plant
HU Huajie
CHENG Junjun

Related Institution

Beijing Litong High tech Development Co., Ltd
Guohua Ninghai Power Plant
Baima Circulating Fluidized Bed Demonstration Power Station Co., Ltd
Huaneng Tongchuan Power Plant
Guangdong Huizhou Natural Gas Power Generation Co., Ltd
0