您当前的位置:
首页 >
文章列表页 >
Study and prevention of common problems of condenser leakage in nuclear power units
更新时间:2025-09-28
    • Study and prevention of common problems of condenser leakage in nuclear power units

    • Thermal Power Generation   Vol. 49, Issue 12, Pages: 164-169(2020)
    • DOI:10.19666/j.rlfd.202003065    

      CLC: TK268+.1
    • Published Online:01 December 2020,

      Published:2020

    移动端阅览

  • ZU Shuai, CHE Yinhui, GUAN Jianjun, et al. Study and prevention of common problems of condenser leakage in nuclear power units[J]. Thermal power generation, 2020, 49(12): 164-169. DOI: 10.19666/j.rlfd.202003065.

  •  
  •  

0

Views

56

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COMPREHENSIVE REMEDY OF CONDENSER LEAKAGE FOR 300 MW STEAM TURBINE
TEST AND ANALYSIS OF CAUSES LEADING TO LEAKAGE IN CONDENSER OF STEAM TURBINE
Leakage detection device of condenser heat exchanger tubes: application situation and improvement measures
Typical faults and countermeasures of flue gas cooler for coal-fired boilers
NOISE CONTROL OF DIESEL GENERATOR SETS

Related Author

LI Yan-dong
LI Zhi-xu
LI Peng-yunGuangdong Electric Power Science Research Institute
ZHANG Weike
LI Junwan
LONG Guojun
HUANG Changyue
LIN Xinguang

Related Institution

Mawan Power Plant
Guangdong Electric Power Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Hainan Power Generation Co., Ltd. Haikou Power Plant
Huaneng International Power Co., Ltd. Fuzhou Power Plant
0