您当前的位置:
首页 >
文章列表页 >
Experimental study on performance of supercritical 350 MW CFB unit based on ASME PTC4 standard
更新时间:2025-09-28
    • Experimental study on performance of supercritical 350 MW CFB unit based on ASME PTC4 standard

    • Thermal Power Generation   Vol. 49, Issue 5, Pages: 97-103(2020)
    • DOI:10.19666/j.rlfd.202002033    

      CLC: TK223.3
    • Published Online:27 April 2020,

      Published:2020

    移动端阅览

  • WANG Zhucheng, QUAN Li, ZHANG Guohua, et al. Experimental study on performance of supercritical 350 MW CFB unit based on ASME PTC4 standard[J]. Thermal power generation, 2020, 49(5): 97-103. DOI: 10.19666/j.rlfd.202002033.

  •  
  •  

0

Views

122

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

An analyzing example for unit energy-saving with low-pressure economizer
Combustion optimization for CFB boiler based on least square support vector machine and modified fruit fly optimization algorithm
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Difference in boiler efficiency calculation between ASME PTC4.1—1964 and ASME PTC4—2013
Study on coal saving benefit calculation matching system of the turbine-boiler coupled heat utilization system

Related Author

HAN Shuang
WANG Weifeng
ZHANG Pengfei
WU Shenglai
XU Yuangang
ZHANG Wenguang
ZHANG Yue
SUN Yazhou

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
State Key Laboratory of New Energy Power System, North China Electric Power University
Chinese People's Liberation Army Unit
Huaneng Laiwu Power Generation Co., Ltd
Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group
0