您当前的位置:
首页 >
文章列表页 >
Morphology and removal of 110mAg in PWR nuclear power station
更新时间:2025-09-28
    • Morphology and removal of 110mAg in PWR nuclear power station

    • Thermal Power Generation   Vol. 49, Issue 6, Pages: 122-127(2020)
    • DOI:10.19666/j.rlfd.201909172    

      CLC: TK112
    • Published Online:24 May 2020,

      Published:2020

    移动端阅览

  • LIN Genxian, SUN Yun, LIU Canshuai, et al. Morphology and removal of 110mAg in PWR nuclear power station[J]. Thermal power generation, 2020, 49(6): 122-127. DOI: 10.19666/j.rlfd.201909172.

  •  
  •  

0

Views

84

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TRANSIENT ANALYSIS ABOUT SWITH OVER OF MOTOR-DRIVEN FEED-WATER PUMP ON CONVENTIONAL ISLAND IN NUCLEAR POWER PLANT
STUDY ON SELECTING CONDENSATE POLISHING SYSTEM FOR PRESSURIZED WATER REACTOR NUCLEAR POWER PLANTS
A SAMMRY OF GLASS-SOLIDIFICATION TECHNOLOGY FOR RADIOACTIVE SOLID WASTAGES
Function analysis for automatic depressurization system in AP1000 nuclear power plant
Cleaning schemes for the secondary circuit in high temperature gas-cooled reactors

Related Author

WU Huanyun Zhongguang Nuclear Power Engineering Co Ltd
YANG Hongbo
JIA Chongyang41.Shandong Electric Power Engineering Consulting Institute Co Ltd
MA Yaohua3
PAN Zhenbo2
WANG Ailing1
CHEN Mingzhou
ZHANG Ruifeng

Related Institution

CGN Engineering Co., Ltd
Datang Baqiao Thermal Power Plant
Guodian Construction Inner Mongolia Energy Co., Ltd
Sanmenxia Huayang Power Generation Co., Ltd
Shandong Electric Power Engineering Consulting Institute Co., Ltd
0