Confirmation conditions of acceptance criteria for boiler pipe blowing
更新时间:2025-09-28
    • Confirmation conditions of acceptance criteria for boiler pipe blowing

    • Thermal Power Generation   Vol. 49, Issue 6, Pages: 118-121(2020)
    • DOI:10.19666/j.rlfd.201909145    

      CLC: G307
    • Published Online:24 May 2020,

      Published:2020

    移动端阅览

  • FU Longlong, WANG Hongyu, LEI Zhaotuan, et al. Confirmation conditions of acceptance criteria for boiler pipe blowing[J]. Thermal power generation, 2020, 49(6): 118-121. DOI: 10.19666/j.rlfd.201909145.

  •  
  •  

0

Views

86

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
STUDY ON TEMPERATURE FIELD MEASUREMENT IN FURNACE AND COMBUSTION DIAGNOSIS METHOD BASED ON DIGITAL IMAGE PROCESSING AND NEURAL NETWORK
STUDY ON SCHEME OF PREVENTING A 200T/H COALFIRING BOILER FROM SLAGGING PROBLEMS
CAUSE ANALYSIS OF FURNACE WALL VIBRATION FOR UTILITY BOILERS

Related Author

HU Min
RAO Supo
LUO Sheng
ZHANG Yu jie
Wu Ping lin
LU L ming
HU Dianru
ZHANG Bo

Related Institution

Shajiao C Power Plant
Guangdong Yuedian Group Co., Ltd.
The Pearl River Power Plant Guangdong
Shaanxi University of Science and Technology
0