Application and analysis of echelon cycle in ultra supercritical 1000 MW unit
摘要
以广东甲湖湾超超临界1 000 MW一次再热机组为例
对梯次循环(EC)的实际工程应用进行了研究。在相同边界条件下
对常规循环和EC分别进行了热力计算
并对EC的运行灵活性进行了分析。结果表明
采用EC可降低电厂设备投资
提高机组经济性
在电厂运行方面无控制难点。EC适用于再热蒸汽温度600℃及以上的一次再热、二次再热项目
其成功应用为实现700℃超超临界发电技术打下工程应用基础。
Abstract
By taking the ultra-supercritical 1000 MW single reheat unit at Guangdong Jiahuwan bay as an example
the actual engineering application of echelon cycle(EC) was studied. Under the same boundary conditions
thermal calculation of the conventional cycle and EC were carried out
and operation flexibility of the EC was analyzed. The results show that
using EC can reduce the equipment investment of power plants
improve the unit economy
and have no control difficulties in plant operation. The EC is applicable to power units with single-reheat/double-reheat with reheat temperature of 600 ℃ and above
and its successful application lays the foundation of engineering application for 700 ℃ ultra supercritical power generation technology.