您当前的位置:
首页 >
文章列表页 >
Study on blowing process of oxide skin of steam pipeline in a 1000 MW unit
更新时间:2025-09-28
    • Study on blowing process of oxide skin of steam pipeline in a 1000 MW unit

    • Thermal Power Generation   Vol. 49, Issue 2, Pages: 93-98(2020)
    • DOI:10.19666/j.rlfd.201905087    

      CLC: TG115;TK223.3+2
    • Published Online:15 January 2020,

      Published:2020

    移动端阅览

  • WANG Lin, WANG Hongyu, GAO Jinghui, et al. Study on blowing process of oxide skin of steam pipeline in a 1000 MW unit[J]. Thermal power generation, 2020, 49(2): 93-98. DOI: 10.19666/j.rlfd.201905087.

  •  
  •  

0

Views

144

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF OVERTEMPERATURE PROBLEM OCCURRED ON PIPE WALL OF HIGH-TEPERATURE HEATING SURFACE FOR BOILERS IN ZHUHAI POWER PLANT AND SOLVING SCHEME THEREOF
INFLUENCE OF OXYGEN TREATMENT FOR SUPERCRITICAL UNITS UPON FORMATION AND PEEL-OFF OF OXIDE SKIN
CAUSE ANALYSIS OF CONTINUOUS TUBE BURST ON HOLDING PIPES OF THE SCREEN-TYPE REHEATER FOR BOILER NO1 IN ONE POWER PLANT
Convective heat transfer characteristics of boiler high temperature superheater under pressurized oxygen enrichment condition
Research on main and reheat steam temperature lifting method for ultra supercritical 1000 MW unit double-tangential circular boiler

Related Author

YE Shan-pei1
WANG Chun-chuang21.Guangqian Electric Power Co Ltd
YU Xuebin
HE Guilin
WANG Hai'ou
GENG Zhaolong Guohua Panshan Power Generation Co Ltd
ZHAO Mingzhong
WU Kai Gansu Electric Power Science Research Institute

Related Institution

Guangqian Electric Power Co., Ltd
Guohua Panshan Power Generation Co., Ltd
Gansu Electric Power Research Institute
College of Architecture and Surveying Engineering, Datong University
Guodian Datong Power Generation Co., Ltd
0