您当前的位置:
首页 >
文章列表页 >
Evaluation system for building integrated energy system based on AHP-CV method
更新时间:2025-09-28
    • Evaluation system for building integrated energy system based on AHP-CV method

    • Thermal Power Generation   Vol. 48, Issue 12, Pages: 25-30(2019)
    • DOI:10.19666/j.rlfd.201904162    

      CLC: TK019
    • Published Online:31 December 2019,

      Published:2019

    移动端阅览

  • YAN Jialun, LIN Junguang, LOU Kewei, et al. Evaluation system for building integrated energy system based on AHP-CV method[J]. Thermal power generation, 2019, 48(12): 25-30. DOI: 10.19666/j.rlfd.201904162.

  •  
  •  

0

Views

365

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS ABOUT APPLICATION OF SUPERCRITICAL 600 MW EXTRACTION STEAM TURBINE FOR HEATING IN INDUSTRY
OPTIMIZATION OF WATER SUPPLYING AND FLUSHING MODE FOR BOILER OF ULTRA-SUPERCRITICAL 1000 MW UNIT
ANALYSIS AND COMPARISON OF DRIVEN MODE FOR INDUCED DRAFT FAN IN THERMAL POWER PLANT
DISCUSSION ON THE AGC TEST AND ITS EVALUATION METHOD
Evaluation indices of flow velocity distribution uniformity:comparison and application

Related Author

LI Bing-zheng1
JIA Qin-lao1
NING Zhe2
ZHU Bao-tian21.Fujian Provincial Hongshan Thermal Power Co Ltd
HUANG Yin
WU Zehua Huaneng Yuhuan Power Plant
TAN Canshen
WU Afeng Guangdong Electric Power Design Institute

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Fujian Hongshan Thermal Power Co., Ltd
Huaneng Yuhuan Power Plant
Guangdong Electric Power Design and Research Institute
Shaanxi Electric Power Science Research Institute
0