您当前的位置:
首页 >
文章列表页 >
Quality control of offshore substation construction in construction stage
更新时间:2025-09-28
    • Quality control of offshore substation construction in construction stage

    • Thermal Power Generation   Vol. 48, Issue 7, Pages: 137-141(2019)
    • DOI:10.19666/j.rlfd.201904089    

      CLC: TM614
    • Published Online:10 July 2019,

      Published:2019

    移动端阅览

  • ZHANG Baofeng, ZHAO Yong, HAN Bin. Quality control of offshore substation construction in construction stage[J]. Thermal power generation, 2019, 48(7): 137-141. DOI: 10.19666/j.rlfd.201904089.

  •  
  •  

0

Views

82

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Integrated application design and economic analysis of hydrogen production by offshore wind power offshore and hydrogen powered ship
Quality defects of underwater assets in offshore wind power and the detecting methods

Related Author

SUN Baixun
YANG Guogang
LIU Xinyu
WANG Hao
LI Yue
WANG Renjie
SI Guangquan
ZHAO Yong

Related Institution

Dalian Maritime University School of Marine Engineering
Traffic Emission Control Monitoring Technology Laboratory
China Huaneng Group Co., Ltd
Huaneng International Power Jiangsu Energy Development Co., Ltd. Clean Energy Branch
Huaneng Liaoning Clean Energy Co., Ltd
0