您当前的位置:
首页 >
文章列表页 >
Practice of intelligent hydropower construction in Pubugou hydropower plant
更新时间:2025-09-28
    • Practice of intelligent hydropower construction in Pubugou hydropower plant

    • Thermal Power Generation   Vol. 48, Issue 9, Pages: 156-160(2019)
    • DOI:10.19666/j.rlfd.201903064    

      CLC: TM622
    • Published Online:05 September 2019,

      Published:2019

    移动端阅览

  • TANG Yong, LIU He, ZHANG Li, et al. Practice of intelligent hydropower construction in Pubugou hydropower plant[J]. Thermal power generation, 2019, 48(9): 156-160. DOI: 10.19666/j.rlfd.201903064.

  •  
  •  

0

Views

249

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Integrated monitoring of ECMS and DCS for thermal power plants

Related Author

ZHANG Wenjian
ZHANG Yongxia
WANG Zhaohui
GONG Xuhui

Related Institution

National Energy Investment Group Co., Ltd
Beijing Guodian Zhishen Control Technology Co., Ltd
0